Skip to main content

Interest is strong in the project to build Chile’s Chacao Bridge

Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract wil
March 4, 2013 Read time: 2 mins
Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract will be awarded in the first quarter of 2014, with work starting in 2015. The bridge is expected to open to traffic in 2019. Its construction is expected to bring jobs to the area and it will also help develop the economy of the island when it is complete. Various projects have been discussed with regard to improving transport connections to the island for some time.

Related Content

  • Chile’s Cau Cau bridge is to be rebuilt
    August 1, 2016
    The tender process for Chile’s Cau Cau Bridge rebuilding project is due to be opened in August 2016.
  • Project building new Biobio bridge in Chile on track
    August 28, 2014
    Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
  • Plans for Chile-Argentina tunnel progressing
    August 14, 2014
    Successful talks have been held between Chile and Argentina regarding the planned Agua Negra road tunnel that will link the two countries. Further talks will be carried out with regard to financing the project but these look set to be completed towards the end of August 2014, according to a report from Business News Americas. One option is for Argentina’s Government to pay for the construction with the costs being recovered through tolling but other financing solutions have also been discussed. The Agua Neg
  • Chiloé island highway proposal
    March 17, 2025
    A new highway is proposed for Chile’s Chiloé island.