Skip to main content

Interest is strong in the project to build Chile’s Chacao Bridge

Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract wil
March 4, 2013 Read time: 2 mins
Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract will be awarded in the first quarter of 2014, with work starting in 2015. The bridge is expected to open to traffic in 2019. Its construction is expected to bring jobs to the area and it will also help develop the economy of the island when it is complete. Various projects have been discussed with regard to improving transport connections to the island for some time.

Related Content

  • Chilean bridge projects delayed
    May 6, 2016
    A number of major bridge projects in Chile are now delayed.
  • Chile’s major bridge project to go ahead
    June 19, 2017
    Construction work could commence on Chile’s landmark Chacao Bridge project as early as July 2017. The construction work is being carried out by a consortium called CPC. The new suspension bridge will be 2.6km long and will connect Chiloe Island with the mainland, costing some US$800 million to build. The design allows the structure to cope with massive earthquakes, due to the risk in this region of Chile.
  • Spanish firms interested in US$740mn Chile bridge project
    June 5, 2013
    Spanish companies Sacyr, ACS and OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile. Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.
  • Strong interest in building new Chile-Argentina tunnel link
    October 30, 2013
    Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as Panedile, Techint, Camargo Correa, Jose Cartellone. It also includes the Chinese firms China Railway Construction Corporation, China Railway Bureau Group, China State Construction Engineering Corporation and Sinohydro Group. Daewoo, Hyundai Engineering and SK Eng & Construct