Skip to main content

Interest is strong in a highway project in Bosnia

Interest is strong in a major road contract in the autonomous Republika Srpska region of Bosnia. So far three Croatian companies, Ingra Inzinjering, Viadukt and Konstruktor have submitted bids for construction of the new highway that is planned and which will be 37km long. The European Bank for Reconstruction and Development approved a finance package worth some €150 million to fund construction of the highway. Bosnian roads company Autoputevi Republike Srpske has said that out of 31 companies which purchas
May 4, 2012 Read time: 1 min
Interest is strong in a major road contract in the autonomous Republika Srpska region of Bosnia. So far three Croatian companies, 5437 Ingra Inzinjering, 5438 Viadukt and 1567 Konstruktor have submitted bids for construction of the new highway that is planned and which will be 37km long. The 1166 European Bank for Reconstruction and Development approved a finance package worth some €150 million to fund construction of the highway. Bosnian roads company 1552 Autoputevi Republike Srpske has said that out of 31 companies which purchased documentation, a total of 12 bids were submitted. Bids arrived from the two unnamed companies from Republika Srpska, in cooperation with partners from Spain, Macedonia, Czech Republic and Italy, a total of two consortia from Turkey and Kazakhstan, Switzerland, Germany, Turkey and a total of two building companies from Austria.

Related Content

  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes
  • Romania’s DEx12 Craiova-Pitesti on target
    November 17, 2021
    The DEx12, costing nearly €1 billion, will include 10 junctions and 75 bridges and passages.
  • Bosnia bore complete
    April 25, 2012
    The contractor driving the 2.1km tunnel on Bosnia’s Gacko-Foca highway has completed the necessary excavation work and is now starting on finishing the lining of the bore. This tunnel is due to open to traffic in late 2012 and some of the €37 million financing for this work has come from the government of the autonomous entity Republika Srpska. The tunnel is one of two on the route, which also features two bridges and a viaduct. Bosnian contractor Integral Inzinjering has been working on the tunnel.
  • New highway connection between Montenegro and Bosnia
    September 23, 2014
    New highway links between Montenegro and Bosnia will make major improvements in transport links for the two countries. Bosnia Herzogovina plans to build its 110km stretch of the Adriatic-Ionic highway that will connect with Montenegro. Meanwhile in Montenegro, plans are in hand for the first stretch of the Bar-Boljare highway. The Bosnian Government is finalising the route for the Adriatic-Ionic highway, based on an earlier feasibility study. This route is of prime importance for the region as it will conne