Skip to main content

Indra awarded Mexican motorway traffic control and toll payment project

Spanish IT company Indra has been awarded the US$ 21.53million contract to install its ITS smart traffic control and toll payment systems at three motorways in Mexico run by the local motorway operator Ideal. Indra will fit its equipment on the Tepic - Guadalajara motorway and on the ring roads to both cities. The toll payment system, which includes remote payment facilities, will be installed at 17 toll points including 149 lanes.
May 28, 2012 Read time: 1 min
Spanish IT company 5264 Indra has been awarded the US$ 21.53million contract to install its ITS smart traffic control and toll payment systems at three motorways in Mexico run by the local motorway operator 3136 Ideal.

Indra will fit its equipment on the Tepic - Guadalajara motorway and on the ring roads to both cities. The toll payment system, which includes remote payment facilities, will be installed at 17 toll points including 149 lanes

For more information on companies in this article

Related Content

  • Mexico: Acapulco’s Escenica Alterna tunnel to open in 2017
    June 6, 2016
    Construction of the Escenica Alterna tunnel in the Mexican resort port city of Acapulco is expected to be finished by June 2017. Work started on the 3.1km tunnel in 2013 with completion originally scheduled for October 2015. But financial problems delayed the US$200 million project which is now around three-quarters complete. Work by the contractor IDEAL - part of conglomerate Grupo Carso - includes construction of an elevated road connecting tunnel with Metlapil motorway.
  • Swift and versatile solutions from Versilis
    January 9, 2019
    Automated access control is not only safer for road crews but reduces the time and cost of deployment of signage for access and traffic control.
  • Czech motorway toll collection to reach $420 million in 2011
    April 24, 2012
    Collection of motorway tolls in the Czech Republic will increase by 25 per cent to US$420 million in 2011, according to the Roads and Motorways Directorate (RSD). The average monthly collection is about $35.75 million.
  • Colombia: Estructura Plural SAC 4G is awarded motorway concession
    July 2, 2015
    Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia. The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels. The existing road will be improved and a second lane added between Medellin and Santa Fe. Meanwhile, Colombian construction firm Construcciones El Condor and the national infrastructure agency ANI have signed a pu