Skip to main content

Indonesia’s US$914.8mn Solo-Mantingan-Kertosono toll road will be a PPP

Indonesia’s proposed US$914.8 million (IDR 8.97tn) 177km Solo-Mantingan-Kertosono toll road is to be developed under the public private partnership (PPP) scheme with Theis Contractors Indonesia, according to Rido Matari Ichwan, head of planning and public works at the Ministry of Foreign Affairs. The project will be receiving loans from China amounting to $300 million. Construction is expected to start by end of 2013.
June 3, 2013 Read time: 1 min
Indonesia’s proposed US$914.8 million (IDR 8.97tn) 177km Solo-Mantingan-Kertosono toll road is to be developed under the public private partnership (PPP) scheme with Theis Contractors Indonesia, according to Rido Matari Ichwan, head of planning and public works at the Ministry of Foreign Affairs.

The project will be receiving loans from China amounting to $300 million. Construction is expected to start by end of 2013.

Related Content

  • Indonesia key highway construction progressing well
    March 13, 2017
    Work on Indonesia’s key Trans-Papua road project is now expected to complete in 2018, later than originally intended. The route will measure 4,300km when complete and work on 3,850km of the route has already been finished. The country’s Ministry of Public Works and Housing has said that the completion of the route will help cut transport costs, boosting competitiveness. But work on a 30km stretch of the road between Manokwari and Kibar has still to be finished due to various problems however.
  • Mozambique receives road funding
    February 16, 2012
    Mozambique's necessary infrastructure work will receive a boost from foreign loans.
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin