Skip to main content

Indian road improvement

Some 433km of roads in six states in India's North East region will be upgraded in work that forms part of the North Eastern State Roads Investment Programme.
February 29, 2012 Read time: 1 min
Some 433km of roads in six states in India's North East region will be upgraded in work that forms part of the North Eastern State Roads Investment Programme. This programme has been approved by 895 India's Cabinet Committee on Economic Affairs, with a portion of the financing coming from the 943 Asian Development Bank (ADB). The coordination with the ADB for the US$301 million project will be carried out by the North Eastern Region Development Ministry. For the first phase the road projects will comprise of 34.2km of roads that will be upgraded or constructed, 93.4km in Meghalaya and 74.7km in Assam while the second phase will include the uplifting of 20.3km in Tripura, 93.2km in Manipur, 55km in Mizoram and some 63km in Assam. The project is due for completion in 2016.

For more information on companies in this article

Related Content

  • Iraq, Turkey, UAE, Qatar sign road MoU
    May 2, 2024
    The four countries wish to improve road connections from Iraq to Turkey for exporting and importing from Europe and Asia.
  • Malaysian contractor to carry out Indian highway project
    November 24, 2017
    A Malaysian contractor will carry out a highway project worth US$357.1 million in India. The project is for the construction of the new National Highway 52 and will be carried out by IJM Corp (IJM). The stretch will connect Solapur in Karnataka State with Bijapur in Maharashtra State. The work involves widening and improving the existing two lane route so that it will have two lanes in either direction.
  • South Eastern Nigeria road project underway
    May 28, 2019
    Construction work on an important road link is underway in South Eastern Nigeria. The US$333 million road link will connect Bodo with Bonny Island. The 35.7km road includes the construction of a new bridge. The work is being carried out by contractor Julius Berger and commenced in 2017, with completion due in 2022. The project faces technical challenges as 7km of the route runs through marshy ground. There have also been issues between residents in the area and the contractor. When complete, the new road w
  • New Nepal road opening to traffic
    May 22, 2018
    An important new road link in Nepal is now open to traffic, having been completed by the Nepal Army. Construction of the new National Priority Road has taken 15 years due in part to the challenging nature of the terrain. The road runs to the north of Nepal to Rasuwagadi, lying on the border with China. Meanwhile the southern end of the highway is at Thori, on the border with India. transport road is of key importance to Nepal as it will provide an important trade link through the country between India and