Skip to main content

India announces four new highway deals

In India the authorities are approving a further four new highway projects. These will be worth nearly US$535 million in total. The highways are located in Uttar Pradesh, Madhya Pradesh, Bihar, West Bengal and Gujarat and the work involves widening and improving the existing NH34 in West Bengal as well as widening a 123km section of the link from Jetpur-Somnath in Gujarat. Both of these upgraded sections will be widened with two lanes in either direction.
May 29, 2012 Read time: 1 min
In India the authorities are approving a further four new highway projects. These will be worth nearly US$535 million in total. The highways are located in Uttar Pradesh, Madhya Pradesh, Bihar, West Bengal and Gujarat and the work involves widening and improving the existing NH34 in West Bengal as well as widening a 123km section of the link from Jetpur-Somnath in Gujarat. Both of these upgraded sections will be widened with two lanes in either direction.

Related Content

  • Highway work planned for China’s Heilongjiang province
    March 9, 2018
    Four new highway links are being planned for China’s Heilongjiang Province. Building the four highways is expected to cost US$2.84 billion, with the work being carried out in 2018. In all the road network in Heilongjiang Province will benefit from work to 61 highway sections, totalling some 2,864km. In addition, 66 existing routes will be upgraded, including a 71km stretch of the expressway connecting Harbin with capital Beijing, which will be widened from two lanes in either direction at present, to four l
  • Green light for Gujarat road projects
    July 6, 2022
    The plans include new and the renovation of highways in the western Indian coastal state.
  • Adani-led consortium wins Chhattisgarh highway project
    April 10, 2018
    A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.