Skip to main content

Indeco reveals new system for selecting tunnelling methods

Italian hydraulic breaker manufacturer Indeco is introducing a new approach to selecting tunnelling methods. The firm says that this has been developed in response to a tunnelling industry that is too-ready to select tunnel boring machines (TBMs).
January 6, 2017 Read time: 2 mins
Indeco: new approach
Italian hydraulic breaker manufacturer Indeco is introducing a new approach to selecting tunnelling methods.

The firm says that this has been developed in response to a tunnelling industry that is too-ready to select tunnel boring machines (TBMs). 237 Indeco’s marketing and commercial manager, Michele Vitulano explained that TBMs are highly efficient in the right conditions and have achieved major successes in a number of projects. However, he said also that these machines are also hampered by a lack of versatility. Changes in rock conditions can cause serious problems such as excessive cutter wear or even breakdowns.

Mauro Amato, product and project manager at Indeco explained that the firm has developed an Analytical Hierarchy Process (AHP) that provides a simplified process for selecting the best excavation method for a tunnelling project.

In Italy tunnelling projects are often carried out using hydraulic breakers fitted to excavators, with loading and hauling equipment to carry away the waste materials. Vitulano asked, “Why are Italian companies working like that?”

And he explained that the complex geology of Italy has meant that for many tunnelling projects, the conditions are not sufficiently homogenous to allow the use of TBMs. Hydraulic breakers have been well proven in tunnelling applications in Italy, as they suit the often fractured or faulted rock conditions. This equipment is comparatively inexpensive, as well as being reliable and versatile. A TBM by comparison is highly expensive to purchase and also requires considerable logistics to supply and install on site.

When fitted to an excavator, a hydraulic breaker provides a highly versatile method. It can be used as a back up to a TBM for difficult tunnelling conditions, as well as playing a similar role with drilling and blasting methods. Alessandro Ciccolella is research and development manager at Indeco and said, “Using a breaker, a contractor can follow fault lines of the rock and increase productivity. It is a precision tool that allows selective excavation.”

He added, “There is a risk factor with a TBM that is totally overlooked by the tunnelling industry. Blasting and breaking are not methods of the past for tunnelling. That’s what we want to highlight.”

For more information on companies in this article

Related Content

  • Italian highway bridge and tunnel link
    February 21, 2022
    A major Italian highway bridge and tunnel link is under construction.
  • Piling accurately with Trimble’s new tool
    June 10, 2019
    Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
  • Growth in a versatile workforce
    July 19, 2012
    Some of the biggest names in the construction industry have released innovative new utility machines and equipment in the first few months of 2012. Guy Woodford looks at some of the latest models To mark the 25th anniversary of the Bobcat compact excavaor range, the Doosan-owned company recently unveiled a new limited edition version of the Bobcat E16. The special 1.6 tonne model is said by the company to provide an attractive complement to the also new and enhanced versions of both the E16 and 1.4tonne E1
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes