Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Highway developments to boost east-west transport
    April 4, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports History was made in late 2010, when one of the biggest road building projects ever envisaged in Eastern Europe was given the green-light. It was the occasion when Russian president Dmitry Medvedev signed a law that would allow his country to build its segment of a huge highway around the Black Sea. The idea is to complete the 7,140km highway, wi
  • Major UK tunnel project proposed
    August 19, 2016
    The UK’s Department for Transport (DfT) has put forward five alternate route options for a new highway connecting the cities of Manchester and Sheffield. The project looks likely to include a major tunnel section measuring as much as 20-30km in length that would run under the Peak District. The aim of the project would be to cut journey times between the two cities as the existing transport routes are prone to peak period congestion and delays at present. The route would connect either the M60 or M67 motorw
  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t