Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Stonehenge Bypass Tunnel project facing judicial review
    February 19, 2021
    The UK’s Stonehenge Bypass Tunnel project is now facing a judicial review.
  • Tunnel contract for Bosnian highway
    December 17, 2012
    Turkish company Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia. The works, which will be done in cooperation with Bosnian company Euroasfalt, will include two tunnels. One of them will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014. Meanwhile, bids are now being offered for a major highway project in Bosnia. This follows the opening of the tender process for the project by Bosnian high
  • Highly relevant: Denmark’s asset management for bridges
    July 12, 2019
    A well-maintained road bridge network is vital to Denmark’s economy. David Arminas caught up with Niels Pedersen, head of bridges at the Danish Road Directorate Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states. The World Bank has classified Denmark as a high-income economy. In 2017 it ranked 16th globally in terms of gros
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o