Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Russia’s trans-continental route
    August 10, 2018
    Russia is spending US$10 billion on building a 2,000km section of road connecting China with the EU – Eugene Gerden reports Russia has now started building a 2,000km section of a new transcontinental route, which will connect China and the EU. According to senior officials from the Russian Ministry of Transport, which is implementing the project, the new road, will be known as the Meridian and will stretch through the Russian territory that borders with Kazakhstan and Belarus. This route forms the Russian
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Spanish highway project to get EIB A-rated bond issue?
    April 20, 2012
    The European Investment Bank (EIB) is reported to be in talks with the sponsors of the A-66 Benavente-Zamora highway public private partnership (PPP) in Spain over a possible bond financing deal, which would see the Bank provide subordinated debt for an A-rated bond issue. The possible bond issue would be a further greenfield project to launch the European Union’s Project Bond 2020 initiative, with its initial pilot stage being managed by the EIB.
  • Colombia dual carriageways under construction
    October 10, 2016
    Colombia is currently working on major highway projects that will improve transport infrastructure in the country and form part of its 4G programme. The US$616.5 million Rumichaca-Pasto dual carriageway in Narino department will improve Colombia’s transport connections with neighbouring Ecuador, cutting journey times from two hours at present to just one hour. The project is being handled by a consortium, Consorcio SAC 4G and involves improving an 80km road section and building additional lanes for the 74km