Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Kazakhstan highway being handled by consortium
    February 12, 2018
    An international consortium has been formed that will handle a major highway project in Kazakhstan. Worth US$730 million, the consortium’s contract is to build and operate a new tolled ring road around the capital, Almaty. The construction consortium comprises the Turkish contractors Alarko and Makyol, SK Engineering & Construction and Korea Expressway. The funding package for the project meanwhile is being provided jointly by the International Finance Corp and European Bank for Reconstruction and
  • New US$200 million ring road to be built in Belarus capital Minsk
    May 23, 2014
    Minsk is to benefit from a new ring road that will cut city congestion - Eugene Gerden reports The government of Belarus is investing more than US$200 million in the building of a new ring road around the country’s capital Minsk, in accordance with a government decree. Implementation of the project is taking place as part of the existing large-scale state road building programme in the country until 2017, with the total cost estimated at US$5 billion. The new road will measure some 85km long and will feat
  • Australia’s costly A$26 billion East Link Project
    February 5, 2025
    Australia’s East Link Project in Victoria will now cost as much as A$26 billion.
  • French tolled highway deal
    March 16, 2012
    Plans are moving forward in France for the beltway project around the city of Strasbourg.