Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Texas highway widening project
    May 9, 2022
    A major Texas highway widening project is planned.
  • US$443 million Medellin tunnel
    July 31, 2024
    A US$443 million road tunnel is planned for Medellin.
  • Kapsch TrafficCom’s the Tolling Wizard of Oz
    April 4, 2014
    Standfirst: Leading tolling technology solution manufacturer Kapsch TrafficCom has recently been appointed to deliver two major electronic tolling projects in Australia, as Guy Woodford reports Kapsch TrafficCom’s new key Australian contracts will see the Austrian firm use its multi-lane free-flow (MLFF) single gantry solution on the Eastern Distributor toll road in Sydney and the Legacy Way toll road in Brisbane. The MLFF single gantry solution includes innovative stereoscopic vehicle detection and classi
  • Tunnel plan for British capital?
    May 14, 2014
    A proposal for an orbital tunnel in UK capital London has been put forward and is now being evaluated. The plan calls for a 35km underground ring road in central London that would carry traffic around the city, in a bid to help reduce the capital’s current chronic congestion. Called the Inner Orbital Route, the tunnel project has an estimated cost of €36.8 billion (£30 billion) and would also include two new crossings of the River Thames. Transport for London (TfL) has been tasked with the job of evaluating