Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Chile-Argentina tunnel project to take nine years
    May 3, 2017
    Construction work for the Agua Negra tunnel connecting Argentina with Chile is expected to take nine years to complete. The actual construction work will commence in 2019, although considerable activity will be required beforehand. Building the tunnel is expected to cost in the orders of US$1.5 billion. Much of the financing for the project is being provided by the Inter-American Development Bank (IADB). So far the IADB has given $20 million to Argentina and a further $20 million to Chile to pay for the nec
  • Budget set for Zimbabwe highway deal
    November 12, 2018
    The budget has been set at US$693 million for the Zimbabwe’s highway running between Harare, Masvingo and Beibridge.
  • Philippines projects proceeding as planned
    October 25, 2016
    Major expressway projects are now moving forward in the Philippines, with building due to start in the first quarter of 2017. Metro Pacific is gearing up to commence construction of the C5 Link Expressway. Meanwhile Metro Pacific Investments Corp (MPIC) has plans to commence construction of the Cavite-Laguna Expressway. The 7.6km C5 Link Expressway forms part of the Cavitex network. The US$291 million project will join the C-5 Road in Taugig to the R-1 Coastal Expressway. The $728 million Cavite-Laguna e
  • Private consortium to finance Melbourne's Peninsula Link highway
    July 13, 2012
    Not long after the recent completion of the successful EastLink project (a 39km motorway providing a vital connection for 1.5 million people in Melbourne, Australia) the Victorian Government has started work on another missing link in Melbourne's freeway network further south with the construction of Peninsula Link. Peninsula Link is a key project in the Victorian Government's AUD$38 billion (US$32 billion) Victorian Transport Plan. With a AUD$750 million (US$630 million) price tag, the project is expected