Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Skid steer loader - more versatile than a jack of all trades
    February 17, 2012
    The skid steer loader has for many years been known as a jack-of-all-trades. Indeed the term loader can be a bit misleading, as a skid steer is far more than simply a digging or lifting machine. Skid steers, and their more recent compact tracked loader stablemates, are the original powered tool carriers. They are designed to work with a host of attachments, not just a bucket or pallet forks. However while this concept of one base machine and a multitude of attachments has been a big success in North America
  • Groundbreaking calculator of greenhouse gas emissions
    April 12, 2012
    IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing. Industry too is changing to meet the new social, environmental and economic challenges of our times. Already, the road sector has taken a decisive lead in this respect by transforming its practices and adopting new, more eco-friendly techniques and technologies. CHANGER is the latest flagship project in this evolution: the sign of an indust
  • Colombia road projects delivered
    September 24, 2020
    Important road projects in Colombia have been delivered successfully.
  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an