Skip to main content

IL&FS get LoI for US$263.9mn Kiratpur Ner Chowk Expressway contract

Kiratpur Ner Chowk Expressway has given IL&FS Engineering Services (IL&FS) a letter of intent (LoI) for an engineering, procurement and construction (EPC) contract in India worth US$263.9 million (INR 14.36bn). Under the deal, IL&FS will undertake a scope of work including minor bridges, five tunnels, 18 major bridges, toll plazas, 67.3km of road work and related infrastructure. The expressway project includes the EPC contract as well as expanding the Kiratpur Ner Chowk section of the National Highway 21 in
March 15, 2013 Read time: 1 min
Kiratpur Ner Chowk Expressway has given IL&FS Engineering Services (IL&FS) a letter of intent (LoI) for an engineering, procurement and construction (EPC) contract in India worth US$263.9 million (INR 14.36bn).

Under the deal, IL&FS will undertake a scope of work including minor bridges, five tunnels, 18 major bridges, toll plazas, 67.3km of road work and related infrastructure. The expressway project includes the EPC contract as well as expanding the Kiratpur Ner Chowk section of the National Highway 21 in Punjab and Himachal Pradesh. Scheduled for completion within 1,005 days of the date of work commencement, the 84km road project will cover the districts of Bilaspur and Manali in Himachal Pradesh and Rupanagar district in Punjab.

To undertake the expressway project, ITNL created Kiratpur Ner Chowk Expressway as a special purpose vehicle.

Related Content

  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
  • Efkon India wins four tolling and ITS contracts
    April 30, 2012
    Austria-headquartered Efkon Group has announced that its Efkon India subsidiary has received four prestigious tolling and ITS contracts valued at some US$8.8 million in total. The company has received a repeat contract from Oriental Structural Engineers to provide the complete ITS product-mix for the Nagpur Bypass project. This contract includes the delivery of advanced traffic management systems (ATMS) for 117 kms and 44 lanes of semi-automatic toll system integrated with a weigh-in-motion (WIM) system. Ef
  • CS involved in two tolling and ITS projects in Poland
    May 14, 2012
    French company CS Communication & Systèmes has announced it has delivered the Poland A1 Phase 2 tolling and ITS project two months ahead of schedule. Earlier this year, Intertoll, the prime contractor of the project, asked CS to accelerate the project that was initially expected to be completed on 21 December, 2011. The scope of this project included the design, supply, installation and maintenance of six toll plazas, 16 automated entry lanes and 23 manual exit lanes. CS also designed and installed a full I
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w