Skip to main content

IFC to provide consultancy on three-section Corridor Vc works

JP Autoceste FBiH, the state-owned motorway company of Bosnia's Muslim–Croat Federation, has revealed that the International Finance Corporation (IFC) will provide consultancy for finding a private partner for three sections of Corridor Vc. The IFC consultancy-covered sections are Doboj Jug (Karusa)-Medakovo (4km); Medakovo-Ozimica (21km); and Ozimica-Poprikusa (13.7km). The consultancy deal will last for a period of 15 months during which a due diligence of costs and a study for the three Corridor Vc secti
May 3, 2013 Read time: 1 min
JP 5740 Autoceste FBiH, the state-owned motorway company of Bosnia's Muslim–Croat Federation, has revealed that the International Finance Corporation (IFC) will provide consultancy for finding a private partner for three sections of Corridor Vc.

The IFC consultancy-covered sections are Doboj Jug (Karusa)-Medakovo (4km); Medakovo-Ozimica (21km); and Ozimica-Poprikusa (13.7km). The consultancy deal will last for a period of 15 months during which a due diligence of costs and a study for the three Corridor Vc sections’ construction will be prepared.

It was said that the Corridor Vc project is expected to attract €300 million in investments. Some 10% of the project will be financed by JP Autoceste, while the remainder will be financed by the IFC through a deal with the potential partner from a private sector.

For more information on companies in this article

Related Content

  • Work on Serbia’s Corridor 10 highway is on track
    April 3, 2014
    In Serbia work on the Corridor 10 highway looks set to be completed as planned in 2016. Serbian roads company, Koridori Srbije, says that that the Corridor 10 motorway should be completed by the middle of 2016. The World Bank (WB) mission visited building sites on Corridor 10 and said that considerable progress has been made, with an additional 23% of works having been carried out in the last 18 month period. In 2014 alone, 50km of the route will be completed. Work is being carried out on 238 bridges, out o
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • Bosnia building highway
    February 27, 2012
    Work on the Pocitelj-Bijaca section of Bosnia's new Corridor Vc highway is due to begin in September of this year.
  • Ring road for Sarajevo nears completion
    December 17, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r