Skip to main content

Iconic bridge dismantled

The iconic Dunlop bridge at Donington Park motor racing circuit in the UK has been carefully dismantled as part of preparations to get the track ready for the 2010 British Formula 1 Grand Prix. The pedestrian bridge straddled the circuit in for more than 30 years, but now it is planned to re-erect the bridge elsewhere on the revamped circuit venue (the position has to be decided). Even with the work on the £100 million (€112 million) redevelopment taking place, Donington Park will still host 500,000 visitor
July 6, 2012 Read time: 1 min
The iconic 3219 Dunlop bridge at 4892 Donington Park motor racing circuit in the UK has been carefully dismantled as part of preparations to get the track ready for the 2010 British Formula 1 Grand Prix. The pedestrian bridge straddled the circuit in for more than 30 years, but now it is planned to re-erect the bridge elsewhere on the revamped circuit venue (the position has to be decided). Even with the work on the £100 million (E112 million) redevelopment taking place, Donington Park will still host 500,000 visitors across several international racing events

For more information on companies in this article

Related Content

  • Eurovia races against the clock for London’s Race of Champions
    June 17, 2016
    Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium. The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award. The circuit was co
  • TRA 2014 showcases the best of cutting-edge transport research and thinking
    July 1, 2014
    Despite tight finances due to the current global economic climate, the recent Transport Research Arena (TRA) 2014 show in Paris showed how innovative transport research, largely using cutting-edge ITS, is creating safer and smarter highways of the future. Guy Woodford reports How far can you drive around a car race track with no other vehicles on it on half a glass of fuel while attempting to maintain a speed of 60kph? After taking up the challenge offered by the Eco Driving Simulator using SiVIC (Simulatio
  • Bechtel achieves tricky bridge replacement in tight timeframe
    March 21, 2012
    Contractor Bechtel has worked with Network Rail to complete a major road bridge upgrade in the UK. A construction team worked 104 hours consecutively to replace the bridge, located at Reading Station.
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports