Skip to main content

Iconic bridge dismantled

The iconic Dunlop bridge at Donington Park motor racing circuit in the UK has been carefully dismantled as part of preparations to get the track ready for the 2010 British Formula 1 Grand Prix. The pedestrian bridge straddled the circuit in for more than 30 years, but now it is planned to re-erect the bridge elsewhere on the revamped circuit venue (the position has to be decided). Even with the work on the £100 million (€112 million) redevelopment taking place, Donington Park will still host 500,000 visitor
July 6, 2012 Read time: 1 min
The iconic 3219 Dunlop bridge at 4892 Donington Park motor racing circuit in the UK has been carefully dismantled as part of preparations to get the track ready for the 2010 British Formula 1 Grand Prix. The pedestrian bridge straddled the circuit in for more than 30 years, but now it is planned to re-erect the bridge elsewhere on the revamped circuit venue (the position has to be decided). Even with the work on the £100 million (E112 million) redevelopment taking place, Donington Park will still host 500,000 visitors across several international racing events

For more information on companies in this article

Related Content

  • Prolec’s On Track with PME
    August 21, 2012
    Prolec last month launched its new Prolec Machine Engine (PME) platform at Donington Park motor racing circuit in central England. The event attracted around 100 customers said to be keen to witness the company’s next-generation, modular safety and control system for plant machinery. At the launch, Prolec described PME as an elegant replacement for its legendary Liftwatch and Heightwatch product ranges. Visitors watched live demonstrations on a Hitachi ZX130 excavator alongside Donington Park’s Launch Pad b
  • Tarmac to complete a lap of Silverstone F1 track in the UK
    May 9, 2019
    UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-