Skip to main content

Ice breakers from Legacy

Legacy Building Solutions has designed and built two new salt storage and winter de-icing operation facilities for Indiana Department of Transportation (INDOT) in the United States. The tension fabric structures, situated near Markle and Westfield, provide each site with a salt storage capacity of 2,993tonnes — enough to cover several months of winter road maintenance.
June 13, 2012 Read time: 2 mins
Legacy Building Solutions two new salt storage and winter de-icing operation facilities for the Indiana Department of Transportation (INDOT) in the United States provide each site with a 2,993tonne salt storage capacity
5913 Legacy Building Solutions has designed and built two new salt storage and winter de-icing operation facilities for 2855 Indiana Department of Transportation (INDOT) in the United States.

The tension fabric structures, situated near Markle and Westfield, provide each site with a salt storage capacity of 2,993tonnes — enough to cover several months of winter road maintenance.

“We were storing salt in older salt domes that do not have enough capacity for our average annual use,” says Steve McAvoy, state facilities manager for INDOT. “The new Legacy buildings address that issue. They were also designed so trucks could enter the building single file to load and off-load under a roof in a safe and controlled manner. The configuration is much more efficient and has already saved us time and money.”

In contrast to traditional web truss structures, the new fabric buildings utilise Legacy’s rigid frame engineering concept, said to allow a high level of design flexibility. The buildings measure 31.7metres by 37metres, and both feature a 2.5metre high concrete wall. In addition to housing a large salt supply, the Legacy structures were specially built to accommodate a fully contained brine-making area, de-icing chemical storage, and a pre-wash pit for cleaning salt trucks prior to entering the maintenance building’s wash bay.

INDOT says it is looking ahead to more innovative design initiatives aimed at additional cost savings, and are keen to grow its list of unit maintenance facilities that have received the Salt Institute’s Excellence in Storage Award for environmentally sensitive salt storage.

For more information on companies in this article

Related Content

  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • Accurate weigh-in-motion technology
    June 21, 2016
    Weigh-in-motion technology is ensuring increasingly accurate, and flexible, weighing stations. Weigh-in-motion specialist manufacturer Axtec says that its space-saving dynamic weighbridge is accurate to within ±0.5% and is the most precise system in the world. From its Runcorn, UK manufacturing facility, Axtec undertakes research and development of new technologies, as well as software testing, fabrication, construction and installation of WIM products. Axtec’s axle weighing platform design is intended f