Skip to main content

Hyundai’s 9A series excavators are better for the environment and the operators

Hyundai Heavy Industries is showcasing its new Robex 9A series of excavators – six crawler excavators and three wheeled excavators – all of which have engines that meet the Tier 4 Interim/EU-Stage IIIB standards on engine emissions. Hyundai has elected to use exhaust gas recirculation (EGR) technology – rather than liquid urea – to meet the emissions targets. “We have full automatic DPF regeneration, which is a big advantage,” said Hyundai product engineer Joachim Van de Perre. “It means that all the items
January 6, 2017 Read time: 2 mins
The Robex 9A series excavators boast improvements to both environmental performance and ergonomics.
236 Hyundai Heavy Industries is showcasing its new Robex 9A series of excavators – six crawler excavators and three wheeled excavators – all of which have engines that meet the Tier 4 Interim/EU-Stage IIIB standards on engine emissions.

Hyundai has elected to use exhaust gas recirculation (EGR) technology – rather than liquid urea – to meet the emissions targets. “We have full automatic DPF regeneration, which is a big advantage,” said Hyundai product engineer Joachim Van de Perre. “It means that all the items are integrated in the engine. It’s less complex than most of our competitors.”

The excavators are driven by 299 Perkins and 196 Cummins engines with EGR and diesel particulate filters (DPF) for engines over 130kW; they aren’t required for the smaller Cummins engines. The DPFs only require cleaning after between 5,000 and 6,000 hours of operation, according to Hyundai.

The display in the cabs has also received an update to a full-colour seven-inch screen, which integrates the rear view camera. With options to add an additional two cameras, perhaps on the blind spot when driving on roads or on an attachment if the machine is working with a crusher, the screen will divide so that the operator has an all-round view.

Other improvements see an inclinometer included on the excavator’s display so that the operator can check that the machine is level. And both the joysticks and the operator’s seat have suspension, rather than the joysticks being fixed, as was previously the case, which increases the comfort for the driver, said Van de Perre.

Hyundai has also included a Bluetooth mobile phone connection for the first time. This allows the operator to communicate with colleagues outside the excavator using the optional hands-free device, which Hyundai expects will be useful for trenching work.

Stand: F8.813A

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12722 0 oLinkExternal www.Hyundai.eu www.Hyundai.eu false /EasySiteWeb/GatewayLink.aspx?alId=12722 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade