Skip to main content

Hungary's highway construction project tender

In Hungary the tender process for the new M3 highway section linking Vasarosnameny and the Number 49 Highway is to be restarted following an unsuccessful bidding process earlier. Meanwhile construction of the section of the M3 highway linking Nyiregyhaza and the 49 highway is now underway.
May 10, 2012 Read time: 1 min
In Hungary the tender process for the new M3 highway section linking Vasarosnameny and the Number 49 Highway is to be restarted following an unsuccessful bidding process earlier. Meanwhile construction
of the section of the M3 highway linking Nyiregyhaza and the 49 highway is now underway. This section of the M3 highway has an estimated cost of €120.5 million and work is being carried out by the C-S-K-K 2009 consortium, which includes 184 Colas Hungaria, 3453 Kelet-Ut, 3454 Kozgep and 945 Strabag.

For more information on companies in this article

Related Content

  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Indonesia bridge project plans revived
    August 9, 2017
    In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to co
  • Mozambique receives road funding
    February 16, 2012
    Mozambique's necessary infrastructure work will receive a boost from foreign loans.