Skip to main content

Hitachi factory hit by tsunami

The Hitachi factory at the port of Hitachinaka has been hit by the second tsunami that hit the coast of Japan's Ibaraki-prefecture.
March 2, 2012 Read time: 1 min
The 233 Hitachi factory at the port of Hitachinaka has been hit by the second tsunami that hit the coast of Japan's Ibaraki-prefecture. Hitachi reports that the factory was evacuated in time but it will probably take a few days before the firm can report the extent of the damage. The facility was built in 2008 and is used to build Hitachi's large rigid trucks and large excavators. Some 2300 Komatsu Group companies were extensively damaged by the tsunami also, including the Ibaraki and Oyama plants. However no substantial damage occurred at either the Kooriyama Plant or Komatsu Utility. The company says it is continuing inspection and repairs of the facilities at Ibaraki, Oyama and Kooriyama and Komatsu Utility in the region.

For more information on companies in this article

Komatsu

Related Content

  • Innovations in earthmoving machines
    March 16, 2012
    The earthmoving machine market is seeing major innovations for 2012 - Mike Woof reports. The early part of 2012 is seeing a whole array of new earthmoving machines come to market from a vast range of manufacturers. Companies from China, Europe, Japan, South Korea, Turkey and the USA will all be unveiling new earthmoving equipment at the upcoming Intermat exhibition, with innovative emission compliant engine and cooling technology.
  • No Skyra limit on Hitachi investment return
    October 30, 2012
    A substantial investment in new Hitachi Construction Equipment machinery is said to have enhanced productivity for the largest aggregates quarry in Cyprus. The Skyra Lima Public Ltd site relies on Hitachi ZW wheeled loaders – supplied by Cypriot Hitachi dealer Unitrak Machinery Ltd – to cope with the tough conditions on the Mediterranean island. The 40-hectare quarry is situated beside the Stavrovouni Monastery – located on the mountain peak of the same name – near the villages of Kornos and Pyrga. It was i
  • Deciding whether to buy new or used equipment
    May 20, 2015
    Customers can face the choice of buying used or new equipment – Dan Gilkes writes. The decision to buy either new or used equipment is almost as old as the construction plant market itself. However some of the reasons for choosing between the two might well be changing, to meet new demands from customers across the world and to cope with a changing supply base. Ever more stringent emissions legislation in Europe, the US and Japan, rapidly developing emerging markets that want the productivity of the latest
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.