Skip to main content

Hillhead extending exhibition space

The organisers of the coming Hillhead quarrying exhibition in the UK are further extending the show facilities. A new 70m long structure will be sited alongside the existing registration pavillion. This will boost the capacity of this part of the showground to 90 exhibitors.
January 23, 2018 Read time: 1 min
The 2018 edition of the Hillhead exhibition is expected to outstrip the successful 2016 show in terms of both visitors and exhibitors
The organisers of the coming 5894 Hillhead quarrying exhibition in the UK are further extending the show facilities. A new 70m long structure will be sited alongside the existing registration pavillion. This will boost the capacity of this part of the showground to 90 exhibitors.


Event director Richard Bradbury explained: ‘With the main pavillion selling out before the end of last year and enquiries still flooding in, we have made the decision to extend again, creating the opportunity for an additional 30 exhibitors to attend.’

Visitor registration is open for the event, which takes place from 26th–28th June at Hillhead Quarry, near Buxton.

For more information on companies in this article

Related Content

  • Researchers trial 3D printing for both concrete and asphalt roads
    February 27, 2019
    Automated road repairs, using 3D printing, could save money and vastly reduce disruption, and researchers are already showing it’s possible - Kristina Smith reports It’s the middle of the night, and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location
  • The UK’s A14 route is seeing a major upgrade
    June 14, 2018
    Work is progressing well on the project to upgrade the busy A14 route in the UK. A major milestone has been achieved with and important phase of the bridge installation having taken place. A 39m viaduct beam has been placed successfully for the bridge, which spans the River Ouse in Cambridgeshire. A key role in this work has been taken by the firm Cleveland Bridge UK. As part of Highways England’s £1.5 billion A14 Cambridge to Huntingdon improvement scheme, Cleveland Bridge was contracted by the A14 Integr
  • FEHRL and CEDR pledge more road research cooperation
    February 10, 2015
    The Forum of European National Highway Research Laboratories (FEHRL) and the Conference of European Directors of Roads (CEDR) have pledged to increase cooperation on road research. A memorandum of understanding to cement the cooperation was signed during a one-day event that featured speakers from national members of FEHRL and CEDR. Stefan Strick, president of FEHRL and also of the German Federal Highway Research Institute, signed the memorandum alongside CEDR president Simon Grima, who is also chief office
  • MIRA builds on reputation for transport excellence
    October 3, 2012
    MIRA in central England has begun a huge redevelopment of its 830 acre site that will see the renowned centre for transport technologies expand its capabilities while, at the same time, create the largest transport research and development technology park in Europe. Guy Woodford reports This is all very impressive,” said Deputy Prime Minister Nick Clegg in April 2011 on hearing a presentation of MIRA’s ambitious expansion plans. As succinct appraisals go, Clegg’s view of MIRA’s plans to develop its brand of