Skip to main content

Highways Department, Thailand may extend two elevated roads to counter floods

The Highways Department (HD) in Thailand is considering an extension on two elevated roads from Bangkok to maintain its traffic links with the South, North and Northeast should the capital be hit with floods. The HD would extend Boromratchonnanee Elevated Road from Phutthamonthon Sai 2 Road to Phetkasem Road to make sure that traffic to the South does not face any disruption caused by floods in the future. The possible move was disclosed by the HD director-general, Chatchawal Buncharoenkit.
October 26, 2012 Read time: 2 mins
The Highways Department (HD) in Thailand is considering an extension on two elevated roads from Bangkok to maintain its traffic links with the South, North and Northeast should the capital be hit with floods.

The HD would extend Boromratchonnanee Elevated Road from Phutthamonthon Sai 2 Road to Phetkasem Road to make sure that traffic to the South does not face any disruption caused by floods in the future. The possible move was disclosed by the HD director-general, Chatchawal Buncharoenkit.

According to the HD’s chief enegineer for design and location, Khasame Srivaranun, the Boromratchonnanee Elevated Road could undergo an extension, stretching 21km to Phetkasem Road, and link to the proposed inter-city motorway from Nakhon Pathom through Samut Songkhram to Phetchaburi's Cha-am district. The Don Muang Tollway could also be extended to Ayutthaya's Bang Pa-in from the Rangsit area for better traffic flow to the North and Northeast. The Don Muang Tollway may also be extended by another 18 km to reach Bang Pa-in interchange.

The government is expected to contribute financing for the projects from its borrowing plan worth US $ 71.80 billion (THB 2.20tn).

Meanwhile, the gaping holes on a lot of roads in Bangkok are also being repaired by the HD. A consultant is being sought to design the project during 2013.

Related Content

  • Santiago’s Autopista Central in line for improvements
    June 18, 2015
    Motorway operator Autopista Central de Chile (AC) has applied to the Ministry of Public Works to make improvements worth around US$340 million to the Autopista Central system in the capital Santiago. Improvements are scheduled for the Quilicura area. AC will present an environmental impact and engineering study this summer to the ministry. Much of the work will take place at night time to avoid traffic disruption. Autopista Central consists of two highways, the westernmost of which branches off from t
  • Philipp Swarovski lays down the marker
    June 10, 2019
    Swarco’s chief operating officer Philipp Swarovski shares his thoughts on highway safety and infrastructure in an age of uncertain future needs. David Arminas reports It was in Austria in 1969 when Manfred Swarovski opened his first glass bead factory. Five years later, operations started in the US. As the years rolled by there followed acquisitions and expansion of manufacturing facilities as well as a shift into intelligent transportation systems globally. Fast forward to 2019 and the family compan
  • Thailand-Laos link
    February 10, 2012
    Plans are being set out for a new bridge to link Thailand with Laos. Work on the fourth Thailand-Lao bridge will commence this month.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c