Skip to main content

Hi-viz hijinks make a flockery of saftey clothing

Fashionable they aren’t, but the wearing of high-visibility clothing is increasingly either recommended by businesses or made mandatory by law, especially for construction workers on every kind of site. But has the use of “hi-vis” clothing, especially the vest, gone too far? In Britain, the wearing of the hi-viz clothing has taken off - literally, according to a BBC television news report that shows a flock of chickens wearing the fluorescent coloured vest.
September 16, 2015 Read time: 2 mins
Fashionable they aren’t, but the wearing of high-visibility clothing is increasingly either recommended by businesses or made mandatory by law, especially for construction workers on every kind of site.

But has the use of “hi-vis” clothing, especially the vest, gone too far?

In Britain, the wearing of the hi-viz clothing has taken off - literally, according to a %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal BBC television news report Visit BBC video page false http://www.bbc.co.uk/newsround/25637631 false false%> that shows a flock of chickens wearing the fluorescent coloured vest.

A more recent example of hi-viz-wearing animals is that of cows, as reported by the UK’s %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Daily Telegraph newspaper Visit www.telegraph.co.uk website false http://www.telegraph.co.uk/news/newstopics/howaboutthat/11758512/Cows-should-wear-fluorescent-jackets-and-strings-of-lights-at-night-council-says.html false false%>. One local authority in England has suggested that cows should not only wear the fluorescent jackets but also wear a string of lights at night so the bovines are safer when crossing country roads and lanes.

Admittedly, some cows have been fatally injured in road accidents.

Farmers, though, said that they had spent years trying to persuade the local authority to introduce traffic calming measures to stop motorists driving with excessive speed through the local lanes.

But to outfit one particular herd, the owner estimated it would cost more than US$4,600 to outfit his herd of 175 cows.

Related Content

  • Doll develops sophisticated suspension system
    March 15, 2013
    German company DOLL says that its sophisticated suspension technology offers better ride performance and steering than previous designs, as well as durability and reliability. The firm’s heavy duty Panther trailer line features independent suspension, delivering a combination of high reliability and optimal driving characteristics according to the company.
  • Saltec brand Torgar is offering innovative access solutions
    January 6, 2017
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Saltec brand Torgar is offering innovative access solutions
    March 27, 2013
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als