Skip to main content

Herrenkencht has developed a novel pipeline installation package

Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
February 6, 2013 Read time: 2 mins
A novel pipelaying system is offered by Herrenknecht
2592 Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the firm and explained, “We can lay pipe up to 1km long in one step. To push the pipe into the ground we have a pipe thruster that can deliver a force of up to 750tonnes.”

The Pipe Express system is controlled remotely from the operating vehicle and there is no need to dig any trenches in advance, reducing personnel requirements and increasing safety. “You can lay pipe directly into the ground,” she said. “With the trench cutter we transport the soil directly to the surface and it’s an economical and efficient method for the pipe laying industry.”

The system can be used in land with a comparatively high water table and in unstable ground, giving it greater versatility than conventional equipment. The surrounding soil structure has minimal disturbance when this equipment is used, while there is no need for complex groundwater lowering. A key feature of this novel approach is the reduced space requirement in comparison with conventional methods using excavators and dump trucks followed by pipelayers, cutting the width required by 70%. This will also reduce installation costs as contractors will have to pay lower land use rates while installing piping. The reduced space requirement is a key point as it will allow pipes to be laid alongside highways for example, while traffic continues to flow. “We think we can lay pipe alongside a motorway for oil, gas, electricity or other utilities,” Rockenstein said.

Stand: C3.415/514

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Herrenknecht.de www.Herrenknecht.de false http://www.herrenknecht.de/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • HAZEMAG combines roller screen/feeder breaker
    February 13, 2013
    HAZEMAG has realised an intelligent, efficient, compact secondary crushing preparation plant with a minimised overall height for the production of 1,500tonnes/hour of lignite following an order last year from P.T Indonesia Pratama, Indonesia. It was the customer’s wish to get an intelligent crushing solution and a low overall height of the preparation plant. HAZEMAG combined a roller screen with the field-tested feeder breaker HFB 0714, thus offering screening and crushing in one unit, which has dimensions
  • Matest high production materials testing
    January 6, 2017
    Material testing equipment manufacturer Matest says its reputation for high production capacity, quality products, fast delivery times, and qualified technical support is acknowledged worldwide. The company offers advanced solutions for onsite and laboratory tests on bitumen, asphalt, concrete, cement, mortar, aggregates, rocks, soil, and steel, representing the ideal partner for anyone working in the construction and civil engineering industries. Its extensive range of material testing equipment is designe
  • Matest high production materials testing
    April 8, 2013
    Material testing equipment manufacturer Matest says its reputation for high production capacity, quality products, fast delivery times, and qualified technical support is acknowledged worldwide. The company offers advanced solutions for onsite and laboratory tests on bitumen, asphalt, concrete, cement, mortar, aggregates, rocks, soil, and steel, representing the ideal partner for anyone working in the construction and civil engineering industries. Its extensive range of material testing equipment is designe
  • BLS showcases its trackpad systems
    January 6, 2017
    Trackpads made by BLS Enterprises for use on Wirtgen milling machines have had their first bauma outing. Component specialist BLS Enterprises is offering a durable replacement track that is a direct replacement for the EPS system. Its distinctive range of blue-coloured pads has been developed to last 15% to 30% longer than conventional polyurethane units. “We want to be known as the people who make the blue pads,” said BLS president Barry Stoughton. Blue pads are the longest-lasting pads, he said. The two-p