Skip to main content

Herrenkencht has developed a novel pipeline installation package

Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
February 6, 2013 Read time: 2 mins
A novel pipelaying system is offered by Herrenknecht
2592 Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the firm and explained, “We can lay pipe up to 1km long in one step. To push the pipe into the ground we have a pipe thruster that can deliver a force of up to 750tonnes.”

The Pipe Express system is controlled remotely from the operating vehicle and there is no need to dig any trenches in advance, reducing personnel requirements and increasing safety. “You can lay pipe directly into the ground,” she said. “With the trench cutter we transport the soil directly to the surface and it’s an economical and efficient method for the pipe laying industry.”

The system can be used in land with a comparatively high water table and in unstable ground, giving it greater versatility than conventional equipment. The surrounding soil structure has minimal disturbance when this equipment is used, while there is no need for complex groundwater lowering. A key feature of this novel approach is the reduced space requirement in comparison with conventional methods using excavators and dump trucks followed by pipelayers, cutting the width required by 70%. This will also reduce installation costs as contractors will have to pay lower land use rates while installing piping. The reduced space requirement is a key point as it will allow pipes to be laid alongside highways for example, while traffic continues to flow. “We think we can lay pipe alongside a motorway for oil, gas, electricity or other utilities,” Rockenstein said.

Stand: C3.415/514

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Herrenknecht.de www.Herrenknecht.de false http://www.herrenknecht.de/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Orlaco offers advanced safety camera solution
    January 6, 2017
    Advanced camera systems for use on heavy equipment from Orlaco Products offer increased safety in construction applications. The company claims its units can be used in a wide array of duties as monitoring systems on heavy equipment, cranes, forklifts and trucks. The company says its rugged units can cope with tough duty cycles where continuous vibrations and temperature fluctuations are common, adding that its visibility solutions meet all high quality requirements. In addition, the firm offers its innovat