Skip to main content

Help for US agencies’ to use new tool to boost concrete pavement quality

In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US Federal Highway Administration (FHWA), the American Association of State Highway and Transportation Officials (AASHTO), and the Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction. Real-time pavement smoothness has been selected for guided implementation under the second Stra
April 23, 2014 Read time: 2 mins
In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US 2410 Federal Highway Administration (FHWA), the 3510 American Association of State Highway and Transportation Officials (AASHTO), and the 2774 Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction.

Real-time pavement smoothness has been selected for guided implementation under the second Strategic Highway Research Program (SHRP2). In May 2014, SHRP2 will begin accepting applications from state departments of transportation (DOTs) who wish to use real-time concrete pavement smoothness to speed up construction and increase quality on their projects.

SHRP2 is an initiative committed to delivering solutions that address growing congestion and aging infrastructure while increasing roadway and construction safety. During typical construction, contractors must wait for concrete pavement to gain adequate strength before evaluating smoothness, which can result in costly penalties and corrective grinding to meet requirements. By monitoring the smoothness of freshly placed concrete, contractors can make timely adjustments to improve operations, increase quality control, and deliver pavements faster.

Two devices measuring real-time pavement smoothness will be available for implementation assistance—the 218 Gomaco Smoothness Indicator (GMI) and the Ames Engineering Real Time Profiler (RTP). These products were selected for implementation after research and evaluation performed by pavement engineering firm The 5943 Transtec Group under SHRP2.

Principal Investigators Dr Robert O. Rasmussen, Steven M. Karamihas and Gary J. Fick evaluated the devices for practicality and accuracy during pavement projects in Georgia, Texas, Arkansas, Michigan, and New York. You can access the full results of this study—including guidelines for implementation—at TRB online.

State DOTs can apply to participate in the SHRP2 effort to familiarise agencies and associated contractors with the selected real-time pavement smoothness devices. The program aims to provide participating agencies with approximately $60,000 worth of equipment rental, training, and technical support.

Agencies interested in participating must apply online during the application period extending from 30 May – 27 June 2014. To learn more, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false false%>

Related Content

  • IPMA provides video on in-place recycling of road surfaces (VIDEO)
    July 4, 2013
    This video from International Pavement Management (IPMA) discusses hot in-place surface recycling job sites in the US state of Georgia. Presenter Blair Barnhardt talks to Brian Frix from Rockdale County and Mike Lehner from Cobb County DOT about their successes with their pavement management programmes.
  • MOBA’s new PAVE-IR system features a high-speed temperature scanner to enhance road construction quality
    March 6, 2014
    MOBA has developed a new temperature scanner system called the PAVE-IR, designed to help operators avoid laying incorrectly heated asphalt. From mixing plant to compaction, getting the temperature of asphalt right is critical. Cold asphalt can lead to road damage, which results in additional costs of up to 46% due shorter surface lifetimes. The new MOBA PAVE-IR aims for an optimum asphalt material mix and the best possible process flow says the manufacturer.
  • IRF releases policy guidelines on safety in road work zones
    April 9, 2018
    The International Road Federation (IRF Global) has published policy guidelines in an effort to draw attention to the urgent need for coordinated efforts to foster a safety culture on road construction sites. Accidents on road construction sites are responsible for hundreds of thousands of injuries and thousands of deaths worldwide. Work zones present an increased risk for workers who build, repair and maintain roads, bridges and tunnels, as well as for a variety of road users, including pedestrians, bicy
  • Delay to SF-Oakland Bay Bridge East Span opening and probe report
    July 9, 2013
    The Toll Bridge Program Oversight Committee (TBPOC) today said that the previously scheduled Labor Day (2 Sep) opening of the new East Span of the San Francisco-Oakland Bay Bridge has been postponed. News of the delayed opening was announced at the same time as TBPOC released its investigative report into the 32 bolts that broke on the Bay Bridge in March 2013, and its review of other bolts on the bridge. The contractor now forecasts that the steel saddle retrofit of the failed bolts on the east pier will b