Skip to main content

Help for US agencies’ to use new tool to boost concrete pavement quality

In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US Federal Highway Administration (FHWA), the American Association of State Highway and Transportation Officials (AASHTO), and the Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction. Real-time pavement smoothness has been selected for guided implementation under the second Stra
April 23, 2014 Read time: 2 mins
In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US 2410 Federal Highway Administration (FHWA), the 3510 American Association of State Highway and Transportation Officials (AASHTO), and the 2774 Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction.

Real-time pavement smoothness has been selected for guided implementation under the second Strategic Highway Research Program (SHRP2). In May 2014, SHRP2 will begin accepting applications from state departments of transportation (DOTs) who wish to use real-time concrete pavement smoothness to speed up construction and increase quality on their projects.

SHRP2 is an initiative committed to delivering solutions that address growing congestion and aging infrastructure while increasing roadway and construction safety. During typical construction, contractors must wait for concrete pavement to gain adequate strength before evaluating smoothness, which can result in costly penalties and corrective grinding to meet requirements. By monitoring the smoothness of freshly placed concrete, contractors can make timely adjustments to improve operations, increase quality control, and deliver pavements faster.

Two devices measuring real-time pavement smoothness will be available for implementation assistance—the 218 Gomaco Smoothness Indicator (GMI) and the Ames Engineering Real Time Profiler (RTP). These products were selected for implementation after research and evaluation performed by pavement engineering firm The 5943 Transtec Group under SHRP2.

Principal Investigators Dr Robert O. Rasmussen, Steven M. Karamihas and Gary J. Fick evaluated the devices for practicality and accuracy during pavement projects in Georgia, Texas, Arkansas, Michigan, and New York. You can access the full results of this study—including guidelines for implementation—at TRB online.

State DOTs can apply to participate in the SHRP2 effort to familiarise agencies and associated contractors with the selected real-time pavement smoothness devices. The program aims to provide participating agencies with approximately $60,000 worth of equipment rental, training, and technical support.

Agencies interested in participating must apply online during the application period extending from 30 May – 27 June 2014. To learn more, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false false%>

Related Content

  • Getech launches new centrifuge for sludge dewatering
    February 26, 2013
    Getech, which says it is among the leaders in the drilling, quarrying and aggregate recycling industries for the water and silt management systems, is introducing its largest model of high performance centrifuge for sludge dewatering in the construction industry. “We have built up extensive knowledge in the last 20 years of processing silts from aggregates, dewatering sludge from the construction of foundations, from quarries, from sand and gravel washing and also recovery of bentonite from weighted mud in
  • Australian capital Canberra looks to upgrade street lighting
    September 12, 2016
    The Australian Capital Territory (ACT) Government said it is seeking proposals for the management of Canberra city’s 79,000 streetlights to improve cost and energy efficiencies.
  • Collaboration on road research and infrastructure innovation
    April 2, 2014
    Transnational collaboration on road infrastructure innovation is the aim of the ERA-NET Plus (EN Plus) Infravation event. The Infravation 2014 Call for this collaboration of 11 countries on road infrastructure innovation will be launched on 3rd March 2014. It will pool funding of some €9 million, of which one-third comes from the European Commission (EC). For the first time, the US Federal Highway Administration (FHWA) will also contribute funding to an EN Plus Call however. This is a major development and
  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in