Skip to main content

Help for US agencies’ to use new tool to boost concrete pavement quality

In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US Federal Highway Administration (FHWA), the American Association of State Highway and Transportation Officials (AASHTO), and the Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction. Real-time pavement smoothness has been selected for guided implementation under the second Stra
April 23, 2014 Read time: 2 mins
In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US 2410 Federal Highway Administration (FHWA), the 3510 American Association of State Highway and Transportation Officials (AASHTO), and the 2774 Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction.

Real-time pavement smoothness has been selected for guided implementation under the second Strategic Highway Research Program (SHRP2). In May 2014, SHRP2 will begin accepting applications from state departments of transportation (DOTs) who wish to use real-time concrete pavement smoothness to speed up construction and increase quality on their projects.

SHRP2 is an initiative committed to delivering solutions that address growing congestion and aging infrastructure while increasing roadway and construction safety. During typical construction, contractors must wait for concrete pavement to gain adequate strength before evaluating smoothness, which can result in costly penalties and corrective grinding to meet requirements. By monitoring the smoothness of freshly placed concrete, contractors can make timely adjustments to improve operations, increase quality control, and deliver pavements faster.

Two devices measuring real-time pavement smoothness will be available for implementation assistance—the 218 Gomaco Smoothness Indicator (GMI) and the Ames Engineering Real Time Profiler (RTP). These products were selected for implementation after research and evaluation performed by pavement engineering firm The 5943 Transtec Group under SHRP2.

Principal Investigators Dr Robert O. Rasmussen, Steven M. Karamihas and Gary J. Fick evaluated the devices for practicality and accuracy during pavement projects in Georgia, Texas, Arkansas, Michigan, and New York. You can access the full results of this study—including guidelines for implementation—at TRB online.

State DOTs can apply to participate in the SHRP2 effort to familiarise agencies and associated contractors with the selected real-time pavement smoothness devices. The program aims to provide participating agencies with approximately $60,000 worth of equipment rental, training, and technical support.

Agencies interested in participating must apply online during the application period extending from 30 May – 27 June 2014. To learn more, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false http://www.fhwa.dot.gov/goshrp2/ImplementationAssistance false false%>

Related Content

  • Boral and Global Ecofuel enter the biofuel and bitumen arena
    May 9, 2019
    An Australian government agency has awarded around US$350,000 to two companies to investigate the production of bitumen and diesel from wood waste. If successful, Australia’s state of New South Wales could become home to the world’s first biorefinery turning sawmill residues into renewable bitumen and diesel, according to ARENA - the Australian Renewable Energy Agency. Under the $842,000 million study, Boral Timber, a major supplier of hardwood and softwood in Australia, will explore the technical and
  • Euro Auctions is expanding its global operations with new acquisition
    January 6, 2017
    Euro Auctions is revealing its expansion plans for 2013 with the addition of a new site to its operations. Based in Dromore, Northern Ireland, Euro Auctions has been conducting unreserved auctions of industrial equipment and construction machinery since 1998. The company has permanent auction sites in Northern Ireland, England, Germany, Spain, Australia and now the USA.
  • Euro Auctions is expanding its global operations with new acquisition
    March 27, 2013
    Euro Auctions is revealing its expansion plans for 2013 with the addition of a new site to its operations. Based in Dromore, Northern Ireland, Euro Auctions has been conducting unreserved auctions of industrial equipment and construction machinery since 1998. The company has permanent auction sites in Northern Ireland, England, Germany, Spain, Australia and now the USA.
  • ERF calls for better safety in Europe´s Work Zones
    May 14, 2015
    The European Road Federation will soon go on the road to promote greater work zone safety “As previous European projects (e.g. ARROWS) have already made proposals for the design of work zones at EU level, it was essential to avoid duplication and find an angle that would provide true added value” The European Commission has just unveiled the road safety statistics for 2014, which point to an overall slowdown in the momentum for casualty reduction achieved over the past few years. While the annual red