Skip to main content

Healthy bidding for Poland's highway construction

Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
May 14, 2012 Read time: 2 mins
Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin.

The section is 60km long and has been divided by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.

The completion of the tenders is scheduled for May 2010. Meanwhile the authorities in the city of Lublin are opening up the tender process for a road to connect with the city’s ring-road. The project is expected to cost over €52 million. Only up to seven investors will be allowed to take part in the tender.

3302 Budimex 3546 Dromex is starting construction work for the 33km section of Poland’s A4 highway between Debica Pustynia and Rzeszow. The deal is worth nearly €435 million and the contractor, a subsidiary of Polish construction firm Budimex, won the tender with the lowest offer for the work.

Meanwhile contractor 1547 NDI has put in the lowest tender for the 34km section of the A4 between Krzyz and the Debica Pustynia junction. NDI has put in a bid of €251 million while the highest bid for the work was nearly €337 million.

A €200 million loan from the 1054 European Investment Bank (EIB) will provide partial funding for Poland’s highway improvement programme. This loan will be used for upgrading an 8km stretch of the A6 highway between Klucz and Kijewo. The loan will also provide partial funding for construction of a 57km section of the A1 highway between Gorzyczki, Sosnica and Maciejow, as well as a 51km stretch of the A4 highway between Zgorzelec and Krzyzowa. Poland’s highway network has already benefited from EIB loans worth €300 million.

Related Content

  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
  • Polish highway deals
    March 2, 2012
    Tenders are being evaluated for a 37km section of the S3 dual carriageway between Gorzow Wielkopolski and Miedzyrzecz in Poland.
  • Strabag closes in on Poland’s S8 Marki-Kobylka contract
    August 19, 2019
    Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio. Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by GDDKiA, Poland’s road authority. Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by I