Skip to main content

Healthy bidding for Poland's highway construction

Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
May 14, 2012 Read time: 2 mins
Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin.

The section is 60km long and has been divided by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.

The completion of the tenders is scheduled for May 2010. Meanwhile the authorities in the city of Lublin are opening up the tender process for a road to connect with the city’s ring-road. The project is expected to cost over €52 million. Only up to seven investors will be allowed to take part in the tender.

3302 Budimex 3546 Dromex is starting construction work for the 33km section of Poland’s A4 highway between Debica Pustynia and Rzeszow. The deal is worth nearly €435 million and the contractor, a subsidiary of Polish construction firm Budimex, won the tender with the lowest offer for the work.

Meanwhile contractor 1547 NDI has put in the lowest tender for the 34km section of the A4 between Krzyz and the Debica Pustynia junction. NDI has put in a bid of €251 million while the highest bid for the work was nearly €337 million.

A €200 million loan from the 1054 European Investment Bank (EIB) will provide partial funding for Poland’s highway improvement programme. This loan will be used for upgrading an 8km stretch of the A6 highway between Klucz and Kijewo. The loan will also provide partial funding for construction of a 57km section of the A1 highway between Gorzyczki, Sosnica and Maciejow, as well as a 51km stretch of the A4 highway between Zgorzelec and Krzyzowa. Poland’s highway network has already benefited from EIB loans worth €300 million.

Related Content

  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Metrostav and Bertelsen & Garpestad in E8 deal
    June 9, 2023
    The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia.