Skip to main content

HCC scoops key India road build deal

The National Highways Authority of India (NHAI) has awarded a US$151.70million contract to HCC Concessions to expand the NH-8's Vadodara-Surat section into six lanes. The contract, for a 12-year concession period, includes 30 months to construct the new six-lane section. The toll-based project also includes the development of an extra-dosed bridge with four lanes across Gujarat's Narmada River.
May 4, 2012 Read time: 1 min
The 292 National Highways Authority of India (NHAI) has awarded a US$151.70million contract to HCC Concessions to expand the NH-8's Vadodara-Surat section into six lanes.

The contract, for a 12-year concession period, includes 30 months to construct the new six-lane section. The toll-based project also includes the development of an extra-dosed bridge with four lanes across Gujarat's Narmada River.

For more information on companies in this article

Related Content

  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • India’s US$13 billion expressway project
    August 14, 2024
    India’s US$13 billion Delhi-Mumbai expressway project should be complete in 2025.
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • India highway link opens to traffic
    March 6, 2018
    A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.