Skip to main content

Haulotte sees sales growth in 2012

French access and telehandler manufacturer Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year. “We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”
April 18, 2013 Read time: 1 min
French access and telehandler manufacturer 712 Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year.

“We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”

Latin American markets showed the strongest recovery last year, led by Brazil, with sales up 76% in the region. This was followed by North America, up 27%, Asia Pacific gaining 24% and Europe recovering to 5.3% growth.

Saubot admitted that sales in the first quarter are down 5% on last year but he said this related to a number of large deals, which have been moved to the second quarter.

“Quarter two will be key and 688 Bauma is definitely one the key events of the year,” he said.

Stand: F9 903/5

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 42817 0 oLinkExternal www.Haulotte.com www.Haulotte.com false /EasySiteWeb/GatewayLink.aspx?alId=42817 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Wassara offers water drilling option
    January 28, 2013
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    January 6, 2017
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a