Skip to main content

Hargreaves make history with US$94.02mn Cat fleet deal

Hargreaves has made history by becoming the first mining project in Europe, Africa and the Middle East to invest in a total solution from the newly extended Caterpillar mining range. The seven year US$94.02million (£60mn) deal with Finning Equipment Solutions includes four new Cat 6030 hydraulic excavators and 19 777 Off Highway trucks, delivered earlier this year to the new Hargreaves’ Surface Mining Division for use at the Tower Colliery open cast mine site in Hirwaun, Rhondda Cynon Taff, South Wales.
June 22, 2012 Read time: 3 mins
RSS5994 Hargreaves has made history by becoming the first mining project in Europe, Africa and the Middle East to invest in a total solution from the newly extended 178 Caterpillar mining range.

The seven year US$94.02million (£60mn) deal with 1413 Finning Equipment Solutions includes four new Cat 6030 hydraulic excavators and 19 777 Off Highway trucks, delivered earlier this year to the new Hargreaves’ Surface Mining Division for use at the 5999 Tower Colliery open cast mine site in Hirwaun, Rhondda Cynon Taff, South Wales.

Following Finning International’s £300million January 2012 purchase from Caterpillar of the former Bucyrus distribution business, the first of the acquired Cat 6030’s was built up onsite in February 2012.

Speaking about the groundbreaking deal with Finning Equipment Solutions, Hargreaves’ Group commercial director Kevin Dougan said: “The Tower Colliery opencast project represents a completely new model for the industry. Hargreaves Services and its joint venture partner Tower Colliery, have worked in partnership with Finning Equipment Solutions to secure investment and over 200 new jobs for the area.

“Hargreaves Services will manage the extraction of six million tonnes of coal from the 615-acre site over the next seven years. We needed to work with a partner that had the equipment, skills, resources and financial stability to fully support the equipment fleet for the whole duration of the project. The securing of the rights to the former Bucyrus distribution business and the investment Finning were prepared to make in supporting us, were both critical in this decision.”

Dougan said that as a result of Finning’s “responsiveness and support” Hargreaves was ready to begin its coal extraction programme. He said extraction would increase in the coming months as more equipment is brought onto the site.

John Vardy, general manager mining at Finning, said: “We are now entering a very significant strategic relationship with Hargreaves, which we will be looking to develop further into the future.”

In the aftermath of the 1984-85 Miner’s strike, the then Conservative government led by Prime Minister Margaret Thatcher tasked British Coal with implementing a massive closure programme, involving many of the UK’s deep mines, on economic grounds. This led to Tower Colliery, which had been a commercial mining site since 1864, officially closing in April 1994.

Soon after the closure Tower Colliery miners decided to buy the site and continue to work it. After each pledging their £8,000 redundancy payouts to the project, the 239 miners involved developed a business plan and attracted financial backing from banks. On January 2, 1995, workers went back into Tower Colliery and began working the next day.

For 13 years following the re-opening Tower Colliery successfully produced high quality coal. In January 2008, with the last economically viable deep coal deposits worked out, the pit was closed for the second time.

Tower Colliery re-opened once again earlier this year after the site was granted permission to extract about 5.9million tonnes of shallow coal deposits. The latest resurrection of the Colliery is a huge boost to South Wales, which has been among the region’s hardest hit by the decline of the British manufacturing sector and the current financial crisis in Britain, continental Europe and other parts of the world.  



For more information on companies in this article

Related Content

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Bitumen technology: from potholes to PMB plants
    November 21, 2014
    This month we look at how warm mix is helping to pave dirt roads, a new way to tackle potholes, and bring news of a new distribution centre for the UK - Kristina Smith reports The creation of a new mix design, incorporating MWV’s warm mix additive Evotherm, is providing cost-effective solutions for dirt roads in the US’s Charleston County. The first stretch to be paved with the new porous paving in April this year, Joseph White Road in the town of Adams Run, resulted in the estimated US$1.1 million construc
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Dozers and graders provide finishing cut
    November 6, 2012
    Established players face increasing competition in the market for bulldozers and graders - Mike Woof reports The world’s largest manufacturer of construction equipment, Caterpillar is a company with a strong position worldwide and this has all grown from its track type tractor range. Caterpillar has long dominated the bulldozer market, as well as being involved in the grader segment since the inter-war period. The firm’s history ties it directly to the development of the crawler track with Ben Holt’s track