Skip to main content

Hanshin Expressway rents space at Osaka’s Gateway Tower building

Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land. There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey off
February 3, 2015 Read time: 2 mins
Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land.

There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey office building, although the enclosed road passes straight through it. This mean there is no vibration from road transmitted into the building and noise is abated by the enclosure around the road.

The elevated road - the Umeda exit of the Ikeda Route of the Hanshin Expressway - is built on supports, as if it were a of bridge construction, in order to pass through the building without touching it. Nonetheless, the road, in effect, occupies the space where floors five, six and seven would have been.

Part of the compromise is that the expressway becomes a tenant of the building, and a good one at that, as it is not likely to decide to move out in a hurry. Needless to say, this compromise took around a decade to reach and included amending some city laws about road construction.

The land had been occupied by a wood and charcoal processing company since the late 1800s. The business had a historical right to redevelop the land but the government had also granted the Hanshin Expressway Corporation permission to build a road.

Landlord and road corporation agreed a solution and in 1992 the Tower Gateway building opened for business, with Hanshin Expressway as its first tenant.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here The Highway that Goes Through a Building false http://www.kuriositas.com/2012/09/highwaythroughabuilding.html false false%> to see The Highway that Goes Through a Building

Related Content

  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Canada: dump truck slams into bridge, partially demolishing it
    February 12, 2015
    In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • AGS demonstrates the power of its new 3D application for the ID4 anti-collision crane safety management system
    January 6, 2017
    Crane and site safety management specialist AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-Fr