Skip to main content

Hanshin Expressway rents space at Osaka’s Gateway Tower building

Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land. There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey off
February 3, 2015 Read time: 2 mins
Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land.

There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey office building, although the enclosed road passes straight through it. This mean there is no vibration from road transmitted into the building and noise is abated by the enclosure around the road.

The elevated road - the Umeda exit of the Ikeda Route of the Hanshin Expressway - is built on supports, as if it were a of bridge construction, in order to pass through the building without touching it. Nonetheless, the road, in effect, occupies the space where floors five, six and seven would have been.

Part of the compromise is that the expressway becomes a tenant of the building, and a good one at that, as it is not likely to decide to move out in a hurry. Needless to say, this compromise took around a decade to reach and included amending some city laws about road construction.

The land had been occupied by a wood and charcoal processing company since the late 1800s. The business had a historical right to redevelop the land but the government had also granted the Hanshin Expressway Corporation permission to build a road.

Landlord and road corporation agreed a solution and in 1992 the Tower Gateway building opened for business, with Hanshin Expressway as its first tenant.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here The Highway that Goes Through a Building false http://www.kuriositas.com/2012/09/highwaythroughabuilding.html false false%> to see The Highway that Goes Through a Building

Related Content

  • VIDEO: Kangaroo takes out cyclist down under
    July 25, 2016
    It caught all the cyclists by surprise when a young bounding kangaroo decided to hurl itself at the peloton during a bicycle race in Australia. A fellow racer trailing behind took the video. The targeted cyclist was severely bruised from hitting the deck and he needed stitches. But the marauding kangaroo apparently died from its injuries when it slammed into the bike at a right angle. Cyclists being taken out by kangaroos is more common than most non-Australians would think. Click here to see one cycl
  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • Innocrush offers its new Innodrive system
    February 12, 2013
    Austrian mobile crushing and screening equipment manufacturer, Innocrush says its team is constantly striving to develop new and innovative systems that enable customers to achieve the maximum profit with their machines. In 2011 the company presented the dsb Innocrush Innodrive in which the equipment is driven directly without coupling and thus no wear or maintenance-intensive components, says Innocrush.