Skip to main content

Hanshin Expressway rents space at Osaka’s Gateway Tower building

Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land. There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey off
February 3, 2015 Read time: 2 mins
Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land.

There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey office building, although the enclosed road passes straight through it. This mean there is no vibration from road transmitted into the building and noise is abated by the enclosure around the road.

The elevated road - the Umeda exit of the Ikeda Route of the Hanshin Expressway - is built on supports, as if it were a of bridge construction, in order to pass through the building without touching it. Nonetheless, the road, in effect, occupies the space where floors five, six and seven would have been.

Part of the compromise is that the expressway becomes a tenant of the building, and a good one at that, as it is not likely to decide to move out in a hurry. Needless to say, this compromise took around a decade to reach and included amending some city laws about road construction.

The land had been occupied by a wood and charcoal processing company since the late 1800s. The business had a historical right to redevelop the land but the government had also granted the Hanshin Expressway Corporation permission to build a road.

Landlord and road corporation agreed a solution and in 1992 the Tower Gateway building opened for business, with Hanshin Expressway as its first tenant.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here The Highway that Goes Through a Building false http://www.kuriositas.com/2012/09/highwaythroughabuilding.html false false%> to see The Highway that Goes Through a Building

Related Content

  • MOBA develops innovative excavator control package
    January 6, 2017
    MOBA is now offering a sophisticated excavator control package that has been developed in partnership with Finnish firm Novatron. The package has been developed along modular lines and the firm’s marketing manager Christine Seidel said, “Once the sensors are installed in the excavator you can start off with the low cost system and upgraded it later.”
  • MOBA develops innovative excavator control package
    February 8, 2013
    MOBA is now offering a sophisticated excavator control package that has been developed in partnership with Finnish firm Novatron. The package has been developed along modular lines and the firm’s marketing manager Christine Seidel said, “Once the sensors are installed in the excavator you can start off with the low cost system and upgraded it later.”
  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel