Skip to main content

Hanshin Expressway rents space at Osaka’s Gateway Tower building

Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land. There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey off
February 3, 2015 Read time: 2 mins
Some cultures value face-saving over outright confrontation. The placing of infrastructure, be they roads, railways or buildings, often requires compromise on the part of all concerned – developers, highway designers, rail consultants and, not least, people who own the land.

There may be no greater monument to this type of compromise than in the Japanese city of Osaka where the Hanshin Expressway meets the Gateway Tower building. Did we say ‘meet’? Not quite, as the highway does not touch the 16-storey office building, although the enclosed road passes straight through it. This mean there is no vibration from road transmitted into the building and noise is abated by the enclosure around the road.

The elevated road - the Umeda exit of the Ikeda Route of the Hanshin Expressway - is built on supports, as if it were a of bridge construction, in order to pass through the building without touching it. Nonetheless, the road, in effect, occupies the space where floors five, six and seven would have been.

Part of the compromise is that the expressway becomes a tenant of the building, and a good one at that, as it is not likely to decide to move out in a hurry. Needless to say, this compromise took around a decade to reach and included amending some city laws about road construction.

The land had been occupied by a wood and charcoal processing company since the late 1800s. The business had a historical right to redevelop the land but the government had also granted the Hanshin Expressway Corporation permission to build a road.

Landlord and road corporation agreed a solution and in 1992 the Tower Gateway building opened for business, with Hanshin Expressway as its first tenant.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here The Highway that Goes Through a Building false http://www.kuriositas.com/2012/09/highwaythroughabuilding.html false false%> to see The Highway that Goes Through a Building

Related Content

  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    April 17, 2013
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required
  • A future UK government should focus more on potholes and road safety
    April 10, 2015
    With a national UK election looming next month, a future government must make road safety a top priority, said the Institute of Advanced Motorists (IAM). Half of motorists in a recent survey of 2,156 people, and conducted IAM in March, said the current administration has not given the issue as much attention as is needed. The number one issue that the government should be focussing on, according to 70% of respondents, is the reduction of the number of potholes. The backlog of repairs now tops more
  • Tsurumi launches new dewatering pump on anniversary
    February 28, 2013
    Submersible pump manufacturer Tsurumi, marking its 30th anniversary in Europe, is launching a new engine driven pumps and a life-extending kit for its products. The new diesel-driven pump (4TBA82D135) is one of Tsurumi’s biggest, and is designed to work at the most demanding dewatering and sewage applications, offering a maximum flow of 2,250litres/minute and a maximum head of 18m. Tsurumi will also introduce a set of life-extending parts for its KTV and KTVE range of lightweight aluminium pumps, saying tha
  • Xylem’s Godwin to showcase non-clog pumps with Flygt N-technology
    January 6, 2017
    Showcasing its range of Godwin portable pumps featuring non-clog Flygt N-technology will be Xylem, which says its Godwin NC-Series is engineered to deliver clog-free pumping for maximum uptime and effectiveness. The design of Flygt N-hydraulics allows stringy solids to pass through easily without clogging the pump and has been used successfully in Flygt dry installed and submersible pumps since 1997. The Flygt N-technology has been proven in more than 300,000 water and wastewater installations around the wo