Skip to main content

Half Ukraine’s roads ‘poor’

Official estimates suggest that 70% of Ukraine’s highways require capital repairs. Meanwhile, 50% of the country’s highways (80,000km) of highways are in a poor condition. Roads have been made worse by recent bad winter weather. According to Ukraine’s state body Ukravtodor, traffic volumes have also increased 5%/year for the last five years, making the problem worse. And Ukravtodor says that repairs to Ukrainian highways will cost not less than €59.5 billion. Meanwhile Ukraine’s design institute Kievsoyuzdo
July 3, 2012 Read time: 1 min
Official estimates suggest that 70% of Ukraine’s highways require capital repairs.

Meanwhile, 50% of the country’s highways (80,000km) of highways are in a poor condition. Roads have been made worse by recent bad winter weather.

According to Ukraine’s state body 2780 UkrAvTodor, traffic volumes have also increased 5%/year for the last five years, making the problem worse. And Ukravtodor says that repairs to Ukrainian highways will cost not less than €59.5 billion. Meanwhile Ukraine’s design institute Kievsoyuzdorproekt says that 95% of the country’s 16,000 bridges do not meet technical standards and require repairs or replacement.

In 2009, 238km of new highways were opened to traffic.

For more information on companies in this article

Related Content

  • France a star in road safety
    September 3, 2012
    In the past, France had a poor road safety record. This has turned around to make the country a success story
  • Europe’s road safety is not improving as previously
    April 3, 2012
    The latest official figures on road safety in Europe are giving cause for concern, with data showing casualty reduction has slowed. EU Transport Commissioner Siim Kallas recently announced a disappointing progress on casualty reduction on Europe's roads. The joint European police association, TISPOL, has added that it is also concerned that improvements in cutting fatalities on Europe’s roads significantly slowed in 2011.
  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • Tajikistan tunnel repair work
    February 11, 2021
    Repair work is planned for Tajikistan’s Istiqlol tunnel.