Skip to main content

Greenest hot rod ever?

Performance car specialist Porsche is the latest firm to announce plans to launch a new plug-in hybrid vehicle.
March 1, 2012 Read time: 1 min
Performance car specialist 3489 Porsche is the latest firm to announce plans to launch a new plug-in hybrid vehicle. With 522kW on tap, a 0-100km/h acceleration time of 3.2seconds and a top speed of 320km/h, this green machine has performance to match some of the highest performance cars on the market. Simulations carried out have estimated that it will be able to lap the full Nürburgring circuit in Germany in 7.5minutes. The car features a V8, 4litre engine and twin electric motors with power delivered through a seven speed gearbox. The car's batteries can be topped up from a 240V household socket but allow a maximum distance of just 25.6km in electric only mode and considerably less if the driver uses much of the vehicle's performance. Made from carbon fibre to minimise weight and with a production run of just 918 vehicles starting in the third quarter of 2013, this car is not likely to be cheap. A pricetag of €773,000 has been set, which puts the vehicle out of reach for most buyers. Somewhat more down to earth is the Vauxhall/Opel Ampera, the European version of the 2773 Chevrolet Volt plug-in hybrid, which is expected to cost some €32,000.

For more information on companies in this article

Related Content

  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Asphalt compaction finishing
    February 16, 2021
    Volvo CE is now offering a new rubber tyred compactor for finishing work in key emergent markets
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l