Skip to main content

Green light for Algeria’s Oran port – East-West Highway motorway link

Authorities in Algeria have given the go-ahead for work on the 14km motorway link connecting the port in Oran to the East-West Highway. Algerian company Engeoa and a Japanese partner are reportedly set to be entrusted with creating the infrastructure. The project is estimated to cost close to US$ 252.22 million (DZD 20bn), not including lighting, ventilation equipment, signalising systems and CCTV in tunnels. The new motorway link means journey time between the Port of Oran and the East-West Highway will be
March 15, 2013 Read time: 1 min
Authorities in Algeria have given the go-ahead for work on the 14km motorway link connecting the port in Oran to the East-West Highway.

Algerian company Engeoa and a Japanese partner are reportedly set to be entrusted with creating the infrastructure. The project is estimated to cost close to US$ 252.22 million (DZD 20bn), not including lighting, ventilation equipment, signalising systems and CCTV in tunnels.

The new motorway link means journey time between the Port of Oran and the East-West Highway will be reduced to just three minutes.

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Algeria’s new key road link to cut congestion
    May 17, 2019
    An important new road section is expected to cut congestion in the area around the city of Constantine once it opens to traffic.
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.
  • Additional highway work is planned for Algeria
    March 26, 2013
    Construction work on Algeria’s planned Hauts-plateaux highway is set to commence at the end of June 2013. The highway will run 1,300km and connect Tébessa with Naâma, with the project being split into three sections. The East stretch will be 220km long while the West section will be 305km long and in the middle will be the 495km Central section. The new highway is expected to provide an important trade route and help improve transport between Algeria and its neighbours and this forms part of Algeria’s 2030