Skip to main content

Green light for Algeria’s Oran port – East-West Highway motorway link

Authorities in Algeria have given the go-ahead for work on the 14km motorway link connecting the port in Oran to the East-West Highway. Algerian company Engeoa and a Japanese partner are reportedly set to be entrusted with creating the infrastructure. The project is estimated to cost close to US$ 252.22 million (DZD 20bn), not including lighting, ventilation equipment, signalising systems and CCTV in tunnels. The new motorway link means journey time between the Port of Oran and the East-West Highway will be
March 15, 2013 Read time: 1 min
Authorities in Algeria have given the go-ahead for work on the 14km motorway link connecting the port in Oran to the East-West Highway.

Algerian company Engeoa and a Japanese partner are reportedly set to be entrusted with creating the infrastructure. The project is estimated to cost close to US$ 252.22 million (DZD 20bn), not including lighting, ventilation equipment, signalising systems and CCTV in tunnels.

The new motorway link means journey time between the Port of Oran and the East-West Highway will be reduced to just three minutes.

Related Content

  • Algeria gives go ahead for 63km Guelma-Annaba motorway
    December 11, 2014
    Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
  • Algeria-Mauritania road project
    January 9, 2023
    An Algeria-Mauritania road project is to commence.
  • Algeria East-West Highway opening due
    September 9, 2015
    The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches
  • Australian state government does a deal with East West Connect
    April 15, 2015
    The state government of Victoria in Australia will pay the East West Connect consortium US$258 million to cancel construction of Melbourne’s East West Link road tunnel. The payoff is to cover the consortium's bidding, design and pre-construction costs and draw a line under the deal that has been mired in financial controversy for years. The federal government slammed Victoria’s decision to bail out of the project as “an obscenity’’ that will cost 7000 jobs, according to a report in The Australian news