Skip to main content

Green concrete production for Holcim

Holcim’s new solar panels will allow green concrete production.
By MJ Woof April 28, 2025 Read time: 2 mins
Solar panels at a Holcim facility in the UK will allow green production capabilities


Holcim UK has continued its renewable energy roll out with its latest installation at one of its sites in Somerset. The firm has introduced solar technology to its Callow Plant near Cheddar, which is home to a hard rock aggregate quarry, readymix concrete plant and building products blocks factory.

A total of 464 solar panels have been installed as part of its ongoing renewable energy installation project on the roof of the site’s block factories. The project, managed by Regenerco with installation carried out by Aniron, will be able to generate more than 167,000 KWh of power per year, equating to 8% of the site’s annual power needs and resulting in a saving of 15.6 tonnes of CO2 emissions per year.

The introduction of more renewable energy sources is a key part of the company’s net zero strategy which aims to achieve zero emissions before 2050. It follows on from rooftop installations at its Huland Ward and Bardon Hill sites in the last 12 months. Luke Olly, Head of Decarbonisation at Holcim UK, said: “We welcome the latest solar installation at one of our UK sites, the first as Holcim UK, and to maintain the momentum that has been created.

“Renewable energy is one of the key components of our net-zero strategy and the more schemes we introduce the more clean energy we can produce, lowering carbon emissions and making our sites more self-sufficient.

“We are already working on a number of further schemes in the pipeline for the rest of 2025 as we continue our journey to net-zero.”

Nigel Price, Director at Burton-based Regenerco which developed the project installation, said: “We are delighted to support Holcim UK with its ongoing clean electricity needs and welcome another successful installation at Callow.”

 

For more information on companies in this article

Related Content

  • Strong attendance points to a successful bauma China show
    December 17, 2014
    Even heavy rain showers on the first day of the bauma China exhibition in Shanghai did not dissuade the crowds packing the outside exhibition areas - Mike Woof writes Those firms exhibiting at bauma China 2014 in Shanghai benefited from a strong show that attracted a record attendance of 191,000, an increase of 6% over the 2012 event. A wide array of new equipment was on show from the 3,104 firms exhibiting, an increase of 14% from 2012. There was a strong focus on technology and new engines required for
  • Strong attendance points to a successful bauma China show
    December 17, 2014
    Even heavy rain showers on the first day of the bauma China exhibition in Shanghai did not dissuade the crowds packing the outside exhibition areas - Mike Woof writes Those firms exhibiting at bauma China 2014 in Shanghai benefited from a strong show that attracted a record attendance of 191,000, an increase of 6% over the 2012 event. A wide array of new equipment was on show from the 3,104 firms exhibiting, an increase of 14% from 2012. There was a strong focus on technology and new engines required for
  • JCB has partially restarted production
    May 14, 2020
    JCB has partially restarted production at UK factories.
  • Hill & Smith report “robust” performance
    November 22, 2012
    Hill & Smith Holdings PLC, the international group with leading positions in the supply of infrastructure products and galvanising services to global markets, said performance of the group between July 1 and November 14, 2012, had been “robust”. Net debt as at 31 October 2012 was £93.3m, compared with £89.1m as reported at the half year. The increase, revealed in Hill and Smith’s Interim Management Statement, was said by the Group to principally reflect its investment in a new galvanising plant in the USA,