Skip to main content

Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine

It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho
November 1, 2016 Read time: 3 mins
Maneuvering the module underneath the shovel
It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia.

The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth.

So the mining company contracted heavy haulage specialist %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Boom Logistics Visit www.goldhofer.de website false http://www.goldhofer.de/en/rescue-for-a-mining-excavator,320.html false false%> to collect the excavator and transport it to the repair shop 22km away.

The job required a 12-axle THP/SL heavy-duty combination from 1449 Goldhofer. Goldhofer is a German-based manufacturer of heavy-duty modular trailers and hydrostatically powered modular transporters. It products can shift loads weighing between 50-10,000 tonnes.

First off, extensive preparations were needed for loading the axle lines because of the difference in height between the mining excavator and the transport system.

As a first step, the earth had to be extracted from under the excavator – with the greatest possible care – to create enough space for the heavy-duty module to be maneuvered into place ready to take the load. When enough material had been removed, the excavator was left standing with just the wheel hubs sitting on the earth, while the rest of the pile had all but disappeared.
The next step was to position the THP/SL underneath the excavator and use the hydraulic suspension stroke to take the load. With the excavator safely loaded, the remaining earth was removed on either side so that the heavy-duty module was left standing free.

A dump truck and a pusher were then used to maneuver the transporter with its load across the uneven ground to the road where two tractors were waiting to tow the mining excavator to the Calenturitas de Prodeco repair shop.

Such transports are made possible by the use of so-called axle lines, such as made by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal China Heavy Lift Visit Youtube page false http://www.youtube.com/watch?v=5kr4I2hQoKY false false%>.

The 120-E machine was built by Orenstein & Koppel, a heavy equipment manufacturer that also produced railway rolling stock. The business was founded in Berlin in 1876 but by the 1960s its sales had declined. Canadian transport manufacturer Bombardier picked up its rail business while in 1999 its construction equipment division was sold to the New Holland Construction, then part of the 1243 Fiat Group.

In 1998, 1222 Terex bought O & K Mining, the division %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal making large hydraulic mining shovels Visit www.youtube.com false http://www.youtube.com/watch?v=Na42gfexwkU false false%>, including the RH120-E.

For more information on companies in this article

Related Content

  • VIDEO: Rollerman Blondeau takes to the hills, Grimsel Pass
    July 26, 2016
    Sure, it’s a spectacular run down a mountain road. But it’s also an extremely visual reminder that highway infrastructure is important for work and play. Let’s not forget that the road - in this case Switzerland’s Grimsel Pass, 2,164m - has to be smooth enough for Jean Yves “Rollerman” Blondeau to reach those speeds without being chucked over edge and down a cliff. The pass is a driver’s delight as it crosses the continental divide in the Alps where rivers flow one way towards the North Sea and the ot
  • VIDEO: Wrong way down a Chinese motorway
    April 19, 2016
    It takes courage to drive down the wrong side of a motorway and a lot of nerve. But this driver in China appears to have both in large quantities as he heads off on his journey. Apparently, his passenger is his equal when it comes to sangfroid. He even appears in camera shot with a big smile on his face. Luckily no crash took place. However, the video stops just before the taxi arrives at something in the road. Was it a road block? If that driving experience wasn’t too unsettling for anyone, then c
  • Video: Wheelchair user hitches car ride up a hill
    November 12, 2015
    A wheelchair user was recently caught hitching a ride up a hill in the Brazilian city of Salvador. It’s slow progress, as the video shows, and care was taken by the driver to deliver his “passenger”. It is not known if the wheelchair owner had to pay for his external ride. His feat was not the first time he has picked up a lift, according to media reports that quote some of his neighbours. Media have also said the city is one of Brazil’s worst for getting around if you are in a wheelchair. The head
  • Consortia line up for Denmark’s Storstrom Bridge project
    February 12, 2015
    Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The new bridge, likely to cost around €565 million including the cost of demolishing the old bridge it will replace, is expected to open by 2021, a