Skip to main content

Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine

It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho
November 1, 2016 Read time: 3 mins
Maneuvering the module underneath the shovel
It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia.

The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth.

So the mining company contracted heavy haulage specialist %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Boom Logistics Visit www.goldhofer.de website false http://www.goldhofer.de/en/rescue-for-a-mining-excavator,320.html false false%> to collect the excavator and transport it to the repair shop 22km away.

The job required a 12-axle THP/SL heavy-duty combination from 1449 Goldhofer. Goldhofer is a German-based manufacturer of heavy-duty modular trailers and hydrostatically powered modular transporters. It products can shift loads weighing between 50-10,000 tonnes.

First off, extensive preparations were needed for loading the axle lines because of the difference in height between the mining excavator and the transport system.

As a first step, the earth had to be extracted from under the excavator – with the greatest possible care – to create enough space for the heavy-duty module to be maneuvered into place ready to take the load. When enough material had been removed, the excavator was left standing with just the wheel hubs sitting on the earth, while the rest of the pile had all but disappeared.
The next step was to position the THP/SL underneath the excavator and use the hydraulic suspension stroke to take the load. With the excavator safely loaded, the remaining earth was removed on either side so that the heavy-duty module was left standing free.

A dump truck and a pusher were then used to maneuver the transporter with its load across the uneven ground to the road where two tractors were waiting to tow the mining excavator to the Calenturitas de Prodeco repair shop.

Such transports are made possible by the use of so-called axle lines, such as made by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal China Heavy Lift Visit Youtube page false http://www.youtube.com/watch?v=5kr4I2hQoKY false false%>.

The 120-E machine was built by Orenstein & Koppel, a heavy equipment manufacturer that also produced railway rolling stock. The business was founded in Berlin in 1876 but by the 1960s its sales had declined. Canadian transport manufacturer Bombardier picked up its rail business while in 1999 its construction equipment division was sold to the New Holland Construction, then part of the 1243 Fiat Group.

In 1998, 1222 Terex bought O & K Mining, the division %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal making large hydraulic mining shovels Visit www.youtube.com false http://www.youtube.com/watch?v=Na42gfexwkU false false%>, including the RH120-E.

For more information on companies in this article

Related Content

  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Snow removal: a right way and a wrong way
    June 12, 2015
    Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.
  • VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike
    October 17, 2016
    Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

    As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.
  • Turkmenistan starts construction of Ashgabat-Turkmenbashi road
    May 8, 2015
    Turkmenistan has started construction of the 544km Ashgabat-Turkmenbashi highway under a public-private partnership contract. The deal is expected to cost between US$800-900 million for every 2km or so of road construction from Ashgabat in central Turkmenistan to Turkmenbashi, a city of around 90,000 on the eastern coast of the Caspian Sea. For a YouTube video graphic representation of the highway, click here. To see World Highways report onTurkmenistan’s highways projects in 2011, click here. Türkmenb