Skip to main content

Godshilla makes a run for it and blocks Isle of Wight road

It was a heart-stopping moment late one night as a car approached an 8m tall animal that was blocking the road. Most people, seeing what should have been an extinct dinosaur – a triceratops – in their path would have turned and run in the opposite direction. But for people in the English village of Godsill, on the Isle of Wight, the dinosaur was a well-known resident, albeit not a living animal. Chris Hollingshead snapped the photo and put it on his Facebook, which can be seen by clicking here.
February 23, 2016 Read time: 2 mins
It was a heart-stopping moment late one night as a car approached an 8m tall animal that was blocking the road.

Most people, seeing what should have been an extinct dinosaur – a triceratops – in their path would have turned and run in the opposite direction.

But for people in the English village of Godsill, on the Isle of Wight, the dinosaur was a well-known resident, albeit not a living animal.

Chris Hollingshead snapped the photo and put it on his Facebook, which can be seen by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal clicking here Visit facebook page false https://www.facebook.com/photo.php?fbid=904716539576905&amp;set=a.421420157906548.97881.100001157027006&amp;type=3&amp;theater false false%>.

It was a priceless moment, he told local media. But he knew that animal, called Godshilla, was a statue prop for a nearby retailer.

Martin Simpson, who owns Island Gems, a shop that sells gems and fossils, told local media that his Godshilla was stolen as a prank from outside his shop and it probably took five people to move the creature onto the road.

To prevent the dinosaur going walk-about again, he said Godshilla will be painted soon, and put into a fenced-in garden.

Related Content

  • CIFA’s ambitions fuelled by R&D gains
    April 18, 2013
    CIFA managing director Davide Cipolla said the Zoomlion-owned firm has “not reached the limit” of what it can offer customers, thanks to a significant investment in research and development. Cipolla, who is also research and development director of the Zoomlion Group's concrete division, commented on a €2million-a-year R&D investment for CIFA and some Zoomlion products over the last five years saying, “This is the first stage of [product] development.” At bauma 2013, CIFA is introducing an innovative hybrid
  • Pavement Preservation Recycling Alliance Forum set for Niagara Falls
    May 18, 2015
    It has been just over three months since the first Pavement Preservation and Recycling Summit in Paris -- PPRS Paris 2015 -- and now the focus will shift to a similarly exciting forum in North America. Under the banner of the cooperative Pavement Preservation Recycling Alliance (PPRA), all specialists in the sector are invited to the beautiful Canadian city of Niagara Falls to share experiences on how to protect, maintain and rehabilitate road assets in the most cost effective manner while embracing recy
  • IRF sets out Road Safety Challenge for Africa
    February 26, 2015
    Organised in collaboration with the Ministry of Transport of Ethiopia and in the premises of the African Union, this international conference and Road Safety Challenge aims at encouraging concrete, measurable implementation of the Decade of Action Plan. It will be held on March 11th and 12th in Ethiopia’s capital, Addis Ababa. Each year nearly 1.3 million people die as a result of a road traffic collision - more than 3,000 deaths each day. Of these, 91% of road traffic deaths occur in low- and middle-income
  • First stage of Chain of Rocks Bridge demolition carried out in US
    January 21, 2015
    Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.