Skip to main content

Go-ahead for controversial highway

APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
May 30, 2012 Read time: 2 mins
APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway.

The work had been delayed as the 2465 European Commission (EC) was concerned over environmental issues facing sections of the  route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms.

The EC says that the sections in zones belonging to the Natura 2000 network can be  built once terms are agreed with the Slovak government on compensations for environmental damage. This decision means that construction works can now start between Poprad and Presov and most parts of the Martin-Ruzomberok section. The approval allows the 1054 European Investment Bank (EIB) to provide a €1 billion loan for the project.

The highway will be built by the consortium  of 2877 Doprastav and Vahostav as a public-private partnership (PPP) under a 30-year concession deal.

The eastern part of the 75km road is expected to open in 2012 and the Martin-Ruzomberok section in 2013.

Although the EIB approved the whole loan, the EC approval is only for certain sections and any works affecting zones which are part of the Natura 2000 network must be postponed until the EC says that the project complies with EU  regulations. The controversial sections include a peatland close to the Natura 2000 zone and pillars in the Vah River which could affect the local environment.

The 2875 Slovakia’s Ministry of Transport says that  99% of problems related to the Turany-Hubovy section have been already resolved, although Priatelia Zeme-CEPA, the Slovak branch of the  Friends of the Earth, and other environmentalist groups claim that construction of the D1  motorway in the Turany-Hubova section cannot comply with the EU Biotop Protection Directive.

Related Content

  • Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses
    September 14, 2016
    The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti
  • Slovakia: early 2017 restart for work on the Cebrat Tunnel
    May 27, 2016
    Roman Brecely, Slovakia’s transport minister, has said that construction of the 2km long motorway tunnel Cebrat near Ruzomberok could be resumed at the beginning of 2017. But the cost is expected to increase by around €100 million. He added that the government likely will seek European Union funding. Construction was halted a year ago over concerns about the possibility of landslides and other geological issues. For this reason, the tunnel route may alter and be an additional 1.5km longer. The tunn
  • Slovakia transport infrastructure boost
    July 24, 2024
    Slovakia is investing in a transport infrastructure boost.
  • EC approves Slovakian highway project
    March 23, 2015
    The EC has given its approval for funding to construct the section of the D1 highway that will connect Hubova with Ivachnova. The EC will provide €169.2 million for the project. In all the 15.3km section of the highway will cost €227.26 million to construct, with the remainder being provided by the state budget. The construction is being carried out by a consortium combining Czech company OHL ZS and Slovak firm Vahostav SK. The work is now underway and the highway is expected to be open to traffic by June 2