Skip to main content

Go-ahead for controversial highway

APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
May 30, 2012 Read time: 2 mins
APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway.

The work had been delayed as the 2465 European Commission (EC) was concerned over environmental issues facing sections of the  route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms.

The EC says that the sections in zones belonging to the Natura 2000 network can be  built once terms are agreed with the Slovak government on compensations for environmental damage. This decision means that construction works can now start between Poprad and Presov and most parts of the Martin-Ruzomberok section. The approval allows the 1054 European Investment Bank (EIB) to provide a €1 billion loan for the project.

The highway will be built by the consortium  of 2877 Doprastav and Vahostav as a public-private partnership (PPP) under a 30-year concession deal.

The eastern part of the 75km road is expected to open in 2012 and the Martin-Ruzomberok section in 2013.

Although the EIB approved the whole loan, the EC approval is only for certain sections and any works affecting zones which are part of the Natura 2000 network must be postponed until the EC says that the project complies with EU  regulations. The controversial sections include a peatland close to the Natura 2000 zone and pillars in the Vah River which could affect the local environment.

The 2875 Slovakia’s Ministry of Transport says that  99% of problems related to the Turany-Hubovy section have been already resolved, although Priatelia Zeme-CEPA, the Slovak branch of the  Friends of the Earth, and other environmentalist groups claim that construction of the D1  motorway in the Turany-Hubova section cannot comply with the EU Biotop Protection Directive.

Related Content

  • Karpaty Tunnel value-for-money scrutinised
    May 19, 2023
    The planned 12km Karpaty Tunnel under the Lesser Carpathian mounts of Slovakia is again being questioned as the government awaits an environmental impact assessment.
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Green light for D35 Litomysl-Janov bypass
    August 15, 2023
    Czech transport ministry aims for construction to start next year on the 10.3km section of motorway, part of the pan-European TEN-T road network.
  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours